Land and Water Resource Management for Agricultural Development in the West Bank

Size: px
Start display at page:

Download "Land and Water Resource Management for Agricultural Development in the West Bank"

Transcription

1 Tender document Open EU award procedure Land and Water Resource Management for Agricultural Development in the West Bank FEZ/IM-327/RAM Ministry of Foreign Affairs Netherlands Representative Office Ramallah Printed: 23 oktober 2012

2 Contents 1. The Ministry of Foreign Affairs The contract general / value / duration / lots Joint tenders Contract award procedure Grounds for exclusion and minimum requirements Contract award Knock-out criteria Award criteria Quality (weighting factor 80%) Price (weighting factor20%) Terms of Reference; wishes and requirements Questions, timetable and submission Conditions...12 Annex 1: Annex to the tender document Land and Water Resource Management for agricultural Development in the West Bank Annex 2A: PARC Progress Report Land Development Program Annex 2B: PARC Land Development Program Monitor Sheet with progress report to Annex 2C: PARC Progres Report Land Development Program Annex 2D: PARC Land Development Program Monitor Sheet with progress report to Annex 3A1: PARC Land Development Program additional information on activities and results Annex 3A2: PARC Land Development Program additional information on activities and results Annex 3B1: LRC Land Development Program additional information on activities and results Annex 3B2: LRC Land Development Program additional information on activities and results Annex 3B3: LRC Land Development Program additional information on activities and results Annex 3B4: LRC Land Development Program additional information on activities and results Annex 3B5: LRC Land Development Program additional information on activities and results Annex 3B6: LRC Land Development Program additional information on activities and results Annex 3B7: LRC Land Development Program additional information on activities and results Annex 3B8: LRC Land Development Program additional information on activities and results Annex 3C1: PHG Land Development Program additional information on activities and results Annex 3D1: RWDS Land Development Program additional information on activities and results Annex 3E1: UAWC Land Development Program additional information on activities and results Annex 3E2: UAWC Land Development Program additional information on activities and results Annex 4: Terms of Reference Land Development Program 2

3 1. The Ministry of Foreign Affairs The Ministry of Foreign Affairs is responsible for coordinating and implementing Dutch foreign policy. The Netherlands is represented in a large number of countries and in many international organisations, and this is reflected in an extensive network of embassies, permanent representations and consulates-general. These missions represent the Kingdom of the Netherlands and therefore all branches of its government. For more information, visit our website: Reducing poverty, increasing prosperity and wellbeing of the Palestinian people and assisting the Palestinian Authority in its efforts to build up an effective and reliable Palestinian State apparatus are the main goals of the development cooperation programme of the Netherlands Representative Office (NRO, established in 1994). The overall aim is to help create the necessary conditions for a viable Palestinian state, as part of a two-state solution for the Middle-East conflict. With the latest Dutch cabinet in place from October 2010, a new policy on development cooperation was launched. The Multi-Annual Strategic Plan (MASP) for the Palestinian Territories (PT) for is based on this new development cooperation policy. Within this policy, the PT is a so-called profile 2 country, in which an integrated approach to peace, security and development forms the core of the program. The NRO will act as the contracting authority for this contract. 2. The contract general / value / duration / lots Within the Multi-Annual Strategic Plan (MASP), food security is one of the focus areas for the PT. The Netherlands Representative Office has defined the following strategic goal, outcomes and outputs for food security in the PT: The NRO wishes to contribute to a situation in which the Palestinian people within the PT have access to sufficient, safe and nutritious food, while Palestinian farmers, including smallholders, have the capacity to compete with their products at national and international markets. One of the strategic outcomes identified is sustainable increase in food production to the benefit of the Palestinian people through improved access to and use of land and water for food production. At output level, the NRO aims at increased availability and use of land and water for food production. In order to realize these objectives and outputs NRO has decided to continue its work on land development. Under the previous MASP ( ) the NRO already funded a project that focused on Land Development. The follow up land development intervention should make use of the important lessons learnt and best practices from the previous land development project. Therefore, in July and August 2012 a needs assessment mission has been carried out to prepare the new project. This needs assessment mission was co-ordinated closely with other 3

4 donors EU, France, Italy, Spain who also have an interest in Land Development in the PT. The mission met with a wide array of stakeholders, including farmers, donors, civil society, and the Palestinian Ministry of Agriculture, looked back at the results of the Land Development project as well as similar interventions funded by other donors, identified the successes and failures and based on that captured lessons learned, best practices, opportunities and risks. It was agreed that all involved donors would use the needs assessment mission report to reassess their current work and to inform the planning of future interventions. Therefore, in the light of its MASP policies and priorities, NRO has made an analysis of the lessons learned, best practices, opportunities and risks that were identified in the needs assessment mission report. This has resulted in the outline of a future land and water resource management for agricultural development in the West Bank program, starting December 1, 2012 and ending May 31, In the ToR (Annexe 4), the outline for the new program is incorporated. The starting points for the new program are: Coherence with the Agricultural Sector Strategy Shared Vision by the Ministry of Agriculture as well as the related Action Plan. The implementing organization will co-ordinate the implementation of the program with the Ministry of Agriculture of the Palestinian Authority. This co-ordination can be done via the to-be-established Supervisory Technical Council comprising of experts from the Ministry and independent local experts selected on professional basis. The Ministry of Agriculture of the Palestinian Authority will, as part of this program, establish a data base system on land developed through an established GIS unit. The program will be implemented in the West Bank only, so not in Gaza. Build on the achievements, lessons learned and best practices of the earlier Land Development Project, as well other similar interventions funded by other donors. Focus on development of infrastructure and access to land, water and markets. A holistic approach in selecting intervention areas as a prerequisite for successful land development. Selection should be done on the basis of land development opportunities in larger geographical areas, coherently considering amongst others: socio-economic factors; availability of water (rainfall, irrigation); costs of land development, potential benefits of land development (e.g. marketing of produce). The selection process should under all circumstances be carried out in close conjunction with the farming households in the area (see points below). As far as land development as such is concerned, only land, for which the owner(s) have land titles, is eligible for inclusion in this program (please also refer to paragraph 3.2 of the TOR, annex 4). This program will follow commonly accepted international standards according to which land development, in all areas including area C, is not subject to permitting. Agricultural land that is underutilized e.g. because of lack of water is also eligible for land development interventions under this program. So the focus does not solely have to be on land that is currently unutilized. The involved farming families (so women and men) should be properly consulted prior to initiating the land development interventions. This will enable these farming households to express their ideas and needs and subsequently it will enable them to be involved in planning and implementation of the land development intervention. 4

5 In relation to the previous point, it is crucial that people s organizations farmers cooperatives are involved in the planning and implementation of the land development interventions. This is extra important because the focus of the Program will be on larger geographical areas, which means interventions will take place at community level or even beyond. Therefore the intervention areas will include numerous farming households. If farmers co-operatives do not yet exist the program could make use of existing structures (village councils) or if required engage with farming households to get new co-operatives established. Build in legal expertise to be able to respond to legal and administrative matters regarding land (development). The total value of the underlying assignment is to be not more than including VAT over 3 years and six months. The value of the contract is a best estimate based on the information currently available. No rights can be derived from it. The currency of the contract will be the currency that the selecting organization uses for its expenditure and accounting. Therefore, interested organizations should submit two budgets, one in the currency used for expenditure and accounting and one in. Firstly, interested organisations should prepare the budget in the currency they use for expenditure and accounting. Secondly, they convert this budget into. They should submit both these budgets and they should indicate the exchange rate they have used to convert the currency they use for expenditure and accounting into. The contract will have a duration of three years and six months, with the possibility of maximum one budget-neutral three month extension. The projected starting date of the assignment under consideration is 1 December This contract is not divided into lots. Further details of the contract will be presented in this tender document. 3. Joint tenders If a tenderer is unable or unwilling to provide the requested goods or services independently, it may submit a joint tender with other organisations. There are two ways of doing so: 1) By forming a consortium, each member of which declares, by signing a Statement of Agreement, that it is jointly and severally liable for fulfilling the obligations arising from the tender and for the performance of the contract. The organisation acting as lead party and the consortium s authorised representative in dealings with the NRO should be specified in Annexe 1 (1.2.A). The consortium should also specify in Annexe 1 (1.3) which activities will be performed by each consortium member (B, C etc.) listed under 1.2. A consortium may not be altered after the closing date of the award procedure. It is not permissible for any of the consortium members to fail to satisfy any of the criteria listed under Grounds for exclusion (see Annexe 1). The conditions apply to all the members. 2) By using subcontractors (third parties, organisations, legal persons, etc.).if it is awarded the contract, the tenderer (who in this case is the principal contractor and lead party), as a contract party (having signed the Statement of Agreement), is jointly and severally liable for the fulfilment of all obligations arising from the contract, including those parts performed by subcontractors. If a tender is submitted by a principal contractor/subcontractors: 5

6 a. The principal contractor must demonstrate in Annexe 1, by means of a statement by each subcontractor, that it has access to the subcontractors resources necessary to perform the contract. It should also make clear to what extent it relies on each subcontractor and in respect of which requirements/criteria and which activities. b. The part of the contract corresponding to particular requirements/criteria must be performed by the designated subcontractor. c. It is not permissible for any of the subcontractors to fail to satisfy any of the criteria listed under Grounds for exclusion in Annexe 1. The conditions apply to both the principal contractor and the subcontractors unless provided otherwise. d. The principal contractor and subcontractors may not be altered after the closing date of the selection procedure, unless prior written permission is obtained from the NRO. By signing the Statement of Agreement, each consortium member / the principal contractor (also acting on behalf of each subcontractor) declare(s) that everything described in the tender (in terms of fulfilment of minimum requirements, knock-out criteria or award criteria) will actually be available or will be fully representative of what will be available for the performance of the contract. By signing the Statement of Agreement, the tenderer (or the consortium s lead party or the principal contractor) declares that all the information requested in Annexe 1 will be supplied by each consortium member and subcontractor (e.g. proof of enrolment in a commercial or professional register and a declaration under article 45 of the Public Procurement Tendering Rules Decree (BAO)). By signing the Statement of Agreement, the tenderer (or principal contractor or consortium member) declares that when supplying information in this award procedure (relating to minimum requirements, knock-out criteria or award criteria), it will indicate the source of the information (e.g. the applicable principal contractor, subcontractor or consortium member). Where a tender is being submitted by a consortium or involves subcontractors, Annexe 1 (1.2) must show who will act as the NRO contact (tenderer A, the single point of responsibility). The NRO will correspond exclusively with the contact / principal contractor. The liaison officer designated by the tenderer (principal contractor, consortium s contact) must have full authority to make decisions and be demonstrably empowered to act on the tenderer s behalf (see Annexe, 1.2). Consortium members or principal contractors/subcontractors are not permitted to submit more than one tender (one bidder, one bid). It is only permissible for several companies belonging to the same group to submit tenders, either independently, as part of a consortium, or as a principal contractor/subcontractor, if they can show at the NRO request that they have each compiled their tender independently of other tenderers (including those belonging to the same group) and have observed confidentiality. If one of the tenderers is unable to show this, all the tenderers belonging to the same group will be excluded from further participation. 4. Contract award procedure The NRO is awarding this contract by means of the open procedure. 6

7 All information concerning the organisation, grounds for exclusion, minimum requirements, knock-out criteria and award criteria must be provided in the format set out in Annexe 1. The contract will be awarded solely on the basis of the information submitted. 5. Grounds for exclusion and minimum requirements The initial selection of tenderers will be based on grounds for exclusion and minimum requirements. A tenderer who fails to satisfy any of the criteria listed under Grounds for exclusion and/or any of the minimum requirements will not be eligible for contract award. 5.1 Grounds for exclusion Tenderers (or consortium members or principal contractors/subcontractors) who: 1) find themselves in one or more of the circumstances referred to in article 45 of the Public Procurement Tendering Rules Decree (BAO); 2) do not submit their tender by 15:00 hours (Ramallah Time) on 3 December 2012; 3) submit statements, annexes or other information that is not correct, complete or regular; 4) act contrary to the tender instructions and/or conditions; will be excluded from further participation in the award procedure. 5.2 Minimum requirements Tenderers who do not meet the following minimum requirements will be excluded from further participation in the award procedure. 1) Minimum turnover Tenderers must have an average annual turnover of at least ,- excluding VAT in the agricultural sector, over the years 2009, 2010, In the case of a consortium, the total turnover in the agricultural sector of the member organisations as a whole may be taken into account. 2) Minimum technical ability / references Tenderers must have performed 1 similar contract since The contract should have started on or later. Similar in this case means that: (a) the contract should have focused on land development, defined as interventions and their consequences aimed at realizing (optimal) utilization of earlier unutilized or underutilized agricultural lands, preferably in the Palestinian Territory (PT). (b) The contract budget and turnover should have been at least Euro 500,000 per annum on the above mentioned land development, defined as interventions and their consequences aimed at realizing (optimal) utilization of earlier unutilized or underutilized agricultural lands, preferably in the Palestinian Territory (PT). 3) The implementing organization is equipped in terms of having experienced human resources for the key administrative positions in the project having the ability and flexibility to hire additional human resources acting according to high standards in transparency and accountability 7

8 6. Contract award The contract will be awarded on the basis of the criterion most economically advantageous tender. This means that both the price and quality of the tender will be taken into account. The selection process will be based on knock-out criteria (hard requirements) and award criteria. 6.1 Knock-out criteria Tenderers who do not meet the following knock-out criteria (quality requirements) will be excluded from further participation in the award procedure. Tenderers must submit information relating to the knock-out criteria in the format set out in Annexe The tenderer agrees to design and implement the program according to the TOR (see Annex 4). 2. The tenderer cannot apply for more than 8,000,000 for the entire project period, including VAT. 3. Acceptance of the draft public service contract and the 2008 General Government Terms and Conditions for Public Service Contracts (ARVODI) included in Annexe 1. By signing the Statement of Agreement, tenderers indicate their acceptance of the draft contract and conditions. Amendments may be proposed in the question round. It is impossible to alter the contract once the final Information Notice has been issued. Conditions drawn up by the contractor or sector explicitly do not apply. No rights may be derived from the draft contract. 4. Acceptance that the Ministry of Agriculture of the Palestinian Authority will, as part of this program, establish a data base system on land developed through an established GIS unit. 6.2 Award criteria Tenderers who are not excluded on the basis of the grounds for exclusion, minimum requirements and knock-out criteria will be assessed on the basis of their score on the award criteria. The contract will be awarded on the basis of the criterion most economically advantageous tender. This means that both the price and quality of the tender will be taken into account. A score from 1 (lowest score) to 10 (highest score) will be awarded for each criterion or subcriterion. These scores will be multiplied by the weighting or sub-weighting factor,resulting in a total score for each tenderer. The contract will be awarded to the tenderer with the highest total score. The following award criteria will be assessed: 8

9 6.2.1 Quality (weighting factor 80%) The award criteria are listed below, together with the corresponding weighting factors. Further details can be found in Annexe 1. You should provide all the information requested. Annexe 1 also specifies the aspects that will be assessed and the corresponding weighting factors. 1. Land Development - Developed in total XXX Dunums of land (XXX Dunum per annum). This goal should be achieved via the following outputs (kindly fill out these outputs in annex 1): - Land leveling (# Dunums) - Building terraces (# Dunums) - Removing rocks (# Dunums) - Opening agricultural roads (# Dunums land made accessible) - Land made arable due to water management and infrastructure interventions (rehabilitation wells, cisterns, pipes, pumps, storage tanks/reservoirs etc.) (#Dunums) - Employment generated with gender breakdown (# Working Days Male/Female) 2. Agricultural production and marketing - On the developed agricultural land the total volume of crop production has increased from XXX tons to XXX tons per annum and by the end of the program, with a breakdown for land owned by women and land owned by men - The value of marketed crops produced on the developed agricultural land has increased from XXX US $ to XXX US $ per annum and by the end of the program, with a breakdown for land owned by women and land owned by men 3. Income - The income that farming households earned on the developed agricultural land has increased from XXX US $ to XXX US $ per annum and by the end of the program, with a breakdown for land owned by women and land owned by men. 4. Empowering women and maximizing their involvement in agriculture. - Priority will be given to development of land owned by women. Where possible these women will be supported in farming these developed lands with high value crops such as strawberries, flowers and herbs. Women will be trained in the production of these crops, assisting them in constructing the infrastructure needed, supplied with agricultural inputs, assisted in processing and marketing their produce. Under award criteria 3 and 4 gender disaggregated data is requested for production, marketing and income. 5. Pilot projects: consider new ways to make land and water resource management for agricultural development in the West Bank successful - Establish a water harvesting dam. The location for this dam still has to be selected. The purpose of this dam will be to transfer treated wastewater to agricultural (land development) areas. In addition this dam will also harvest and transfer rain water. - Combat desertification and adaptation to climate change Desertification and climate change are serious problems that farming households face today and that will not disappear in the near future. Hence, combating desertification and improving the capacity of farming households to adapt to climate change is a priority in arid and semi arid areas. Farming households need to learn and adopt new methods, technologies and improve 9

10 their capacity to adapt to climate change. Apart from soil water conservation practices, diversification of crop selection is a very important element of an adaptation strategy. Therefore, an important indicator of change will be the extent to which farming households have diversified crop selection as a climate change adaptation strategy and the results this diversified crop selection has yielded. 6. One of the main goals of NRO is to empower and build the capacity of local civil society. - Therefore, NRO honors the principle that everything that can be done locally, should be done locally. This means that interested international organizations must work with local civil society in the implementation of this program (this tender is open for local as well as international organisations). - Furthermore, from the same principles it follows that NRO highly values the build up and empowerment of people s institutions such as farmer s co-operatives and other community based organisations. The involvement of these people s institutions (co-operatives) in planning and implementation is also crucial as this project considers (the interconnected) opportunities in larger geographical localities to come to the most effective and efficient land development. Given that land development is taken up for a larger geographical area it is paramount that the farming households in these areas are also connected and work together via people s institutions (co-operatives). 10 Quality Award criteria (80%) Weighting factor Subweighting factor 1 Land Development 50% Sustainably developed in total XXX Dunums of land (XXX 40% Dunum per annum). This goal should be achieved via the following outputs: Land leveling (# Dunums) 5% Building terraces (# Dunums) 5% Removing rocks (# Dunums) 5% Opening agricultural roads to make land accessible (# Dunums) 5% Land made arable due to water management and infrastructure interventions (rehabilitation wells, cisterns, pipes, pumps, storage tanks/reservoirs etc.)(#dunums) Employment generated with gender breakdown (# Working Days Male/Female) 2 Agricultural production and marketing 10% On the developed agricultural land the total volume of crop production has increased from XXX tons to XXX tons per annum and by the end of the program, with a breakdown for land owned by women and land owned by men. The value of marketed crops produced on the developed agricultural land has increased from XXX US $ to XXX US $ per annum and by the end of the program, with a breakdown for land owned by women and land owned by men. 3 Income 10% The income that farmers earned on the developed agricultural land has increased from XXX US $ to XXX US $ per annum and by the end of the program with a breakdown for land owned by women and land owned by men. 20% 20% 50% 50% 100%

11 4 Empowering women and maximizing their involvement in agriculture. Priority will be given to development of land owned by women plus farming & marketing support for these women farmers 5 Pilot projects: consider new ways to make land and water resource management for agricultural development in the West Bank successful Established water harvesting dam. Purpose of the dam is to transfer treated wastewater to agricultural (land development) areas. In addition this dam will also harvest and transfer rain water. Combat desertification and adaptation to climate change with a focus on crop diversification 10% 10% 6 Empowerment civil society including peoples institutions 10% 100% 50% 50% Project planning and implementation by/with local civil society 50% Farmers institutions/cooperatives are empowered to play a leading role in planning and implementation of land development work Total 100% Price (weighting factor20%) 50% You should present your bid price as specified in Annexe 1: in the currency that you use for expenditure and accounting as well as in and including VAT per year for the period until The prices bid are fixed; no changes are permitted at any stage. The maximum contract price is 8 million euros including VAT per year. This is not an indication of what the bid price must be, but the price must not exceed this amount. The lowest price will receive the maximum score of 10 points. The score for other bid prices will be calculated as follows: (lowest price / price in question) multiplied by 10. The lowest possible score is 1. No adjustments for inflation may be made for the duration of the contract. Tenderers should therefore take inflation into account when making their bids (indexation). The NRO reserves the right to disregard tenders with bid prices (for the entire contract or parts of it) that are not in line with the market (i.e. that are extremely high or extremely low). 7. Terms of Reference; wishes and requirements See Annex Questions, timetable and submission You can ask questions about the tender document until November 22 th You should the questions to fez-tender2@minbuza.nl. Each question should include the number of the section in the tender document to which it relates, and quote the relevant passage. 11

12 All questions will be answered, rendered anonymous and combined into an Information Notice. The Notice will be published at It forms part of the tender documents. The closing date and time for submitting tenders is 15:00 hours (Ramallah time) on 3 December Tenders received after this deadline will not be taken into consideration. The envelope / package should bear the following words: the Netherlands Ministry of Foreign Affairs, NRO Ramallah, attn Martijn Lucassen, Policy Advisor Economic Affairs, Tender FEZ/IM-327/RAM, 12, Holanda Street, Al Bireh, Ramallah. You are requested to deliver the tender in person (so not by postal service). You can do so on working days between 09:00 and 15:00 hours (Ramallah time) at the the Netherlands Ministry of Foreign Affairs, NRO Ramallah, attn Martijn Lucassen, Policy Advisor Economic Affairs, Tender FEZ/IM-327/RAM, 12, Holanda Street, Al Bireh, Ramallah. The NRO will provide a receipt on request. Three copies of the tender must be submitted: one complete, original set, one easy-to-copy set (no tabs, plastic sleeves, foldouts, staples, etc.), and one set in MS Word/Excel on CD- ROM or USB device. The files should have the same names and be supplied in the same order as requested in Annexe 1. The opening of the tenders will take place in public at 16:00 hours (Ramallah time) on 3 December 2012 at the Netherlands Ministry of Foreign Affairs, NRO Ramallah, 12 Hollanda street, Al Bireh, Ramallah. If you plan to attend, you are requested to notify the NRO by sending an to: martijn.lucassen@minbuza.nl. One representative per tenderer may attend. Representatives must bring a valid identity document with them. The NRO will seek to award the contract by the end of November The contract will be awarded to a tenderer provisionally. Tenderers who are not awarded the contract will be notified at the same time in writing and by . Tenders must be organised using the tabs described in Annexe 1. The NRO is not obliged to consider any documents that do not comply with the prescribed format or are incomplete and will not return them. Tenders submitted by , fax or similar means will not be accepted. If the documents show inconsistencies, the text of the complete, original set of documents will take precedence. Risks relating to delivery delays or the use of incorrect or incomplete addresses will be borne by the tenderers. Submitted and accepted documents will not be returned. Tenders should be sent in appropriate, sealed packaging. Tenders should bear sufficient postage. The NRO will refuse packages on which extra postage has to be paid. Annexe 1 must be completed, signed and submitted exactly as requested. Altering or making additions to the fixed text of Annexe 1 or tender documents is not permitted. If this is found to have been done without permission, the tenderer may be excluded from further participation or any contract signed may be terminated. 9. Conditions 1. The NRO reserves the right to stop, suspend or terminate the award procedure without stating its reasons for doing so. 12

13 2. Tenderers must bear all costs that they incur as a result of the tender procedure. These costs are not eligible for reimbursement. By registering as a participant, tenderers agree to this condition. 3. By submitting a bid, a tenderer declares that the references it has given and the staffing, quality assurance system, materials etc. it has described are representative of the quality of the performance of the contract / resources to be used for the contract / the products to be supplied. 4. If a tenderer attaches conditions or reservations to its tender, the tender will be considered not to have been submitted, and will be deemed invalid. Conditions drawn up by the tenderer or sector explicitly do not apply. 5. All requested information, statements and other documents should be in English 6. All correspondence and documentation drawn up by the NRO will be in English. Correspondence relating to this contract award procedure should be in English 7. By signing the Statement of Agreement in Annexe 1, the tenderer vouches for the accuracy, completeness and regularity of all the information requested and supplied, and agrees to all the conditions contained in the tender documents. Tenderers who provide inaccurate information may be excluded from the contract award procedure at any time. 8. Annexe 1 must be signed by an official authorised to represent the tenderer and conclude binding agreements. As a rule, it should be the representative enrolled in a commercial or professional register at the Chamber of Commerce. 9. The requirements and criteria set by the NRO and the information provided by the NRO in this award procedure are based on the NRO s best estimate of the size of the contract. Tenderers may derive no rights from this information (e.g. relating to numbers, specifications or the timetable). The information is intended to give an indication of the contract award procedure and provide a basis for comparing tenderers. 11.Barring exceptions set out in the Copyright Act (Auteurswet), no part of this document may be reproduced (other than for the purpose of this award procedure) by means of print, photocopy, microfilm, or in any other form without the written permission of the NRO (intellectual property). 12.Directive 2004/18/EC (on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts) and the Public Procurement Tendering Rules Decree (BAO) apply to the award procedure. 13.This tender document was drawn up with due care. If a tenderer nevertheless finds contradictions or flaws, it should inform the NRO of them as soon as possible before the closing date for submitting tenders. If it later emerges that this document contains flaws or contradictions that were not reported by the tenderer, the NRO cannot be held responsible. 14.The NRO invites tenderers to ask any questions and make any objections they may have concerning the tender documents. Failure to take up this invitation may affect any subsequent claims. Reference is made in this regard to the judgment of the Court of Justice of the European Communities (ECJ) in case C-230/02 (the Grossmann judgment) of 12 February 2004, case law 2004, p. I By signing the tender, a tenderer undertakes to maintain confidentiality with regard to all information obtained in connection with this award procedure and not to provide any information to third parties. An exception can be made for consortium members, subcontractors or third parties who provide assistance in the preparation of the tender. In such cases the tenderer remains responsible for ensuring compliance with the duty of confidentiality. 16.Publicity regarding this award procedure is only allowed after obtaining the written approval of the NRO. 13

14 17. The present tender has not come about under the influence of an agreement, decision or conduct that contravenes Dutch or EU competition law. 18.The NRO will observe confidentiality with respect to any information provided by tenderers and will use this information only for the purpose of this award procedure. 19.The tenderer undertakes not to make any statements of any kind that could harm any of the other participants.tenderers who breach this condition may be excluded from further participation in this award procedure. 20.The NRO reserves the right to check the accuracy of all the information provided by tenderers, to request official supporting documents and to contact referees directly. 21.Oral communications, undertakings or agreements have no legal force unless confirmed in writing. 22.Tenderers declare that there is no conflict of interest between their companies and the NRO. Conflict of interest includes employing an employee of the NRO or a former employee who left the NRO less than two years ago who is or will be directly or indirectly involved in the current award procedure or the performance of the contract. In such an event, a tenderer should report this to the NRO. If the NRO has legitimate reasons for assuming that, contrary to a tenderer s declaration, a conflict of interest does in fact exist, the tenderer will be excluded from the award procedure. 23.Organisations or individuals that are involved in this award procedure as external advisers to the NRO or in any other way are not permitted to submit or participate in the preparatory work for the submission of tenders. 24.This contract award procedure (including tenders submitted) is subject to Dutch law. 25.Tenderers must maintain their offers for 120 days after the closure date or for such further period as is necessary for the judge hearing applications for provisional relief (voorzieningenrechter) to give a decision. 26.A condition for contract award becoming final is that the parties reach agreement on the contract. The contract is included in Annexe Once the contract award is final, the contractor must initial every page of the contract and the conditions upon signing the contract. 28.The Regulations on Travel Allowances for External Advisers (BZ Reiskostenvergoeding externe adviseurs 2010, REA) apply to advisers who make working visits to other countries in connection with the contract. The REA is included in Annexe 1. Tenderers should take this into account when setting the price. By signing the Statement of Agreement, tenderers declare that the REA applies to this contract. 29.The Ministry wants to receive and process 10% of all incoming invoices electronically in 2010, rising to 80% in It is also working on electronic ordering. Candidates must therefore declare themselves willing to exchange information on invoices and orders electronically, in accordance with the Ministry s technical instructions (standard format) and conditions, within six months of being requested to do so by the Ministry. They must be willing to bear the cost of implementation and maintenance; the cost will be reasonably proportionate to the size of the contract. 30.If none of the tenderers to which the contract is not to be awarded have instituted interlocutory injunction proceedings (kort geding) within 15 days of being sent the notice of the contract award decision, the contract award will become final and the contract will be concluded. 31.Tenderers wishing to institute interlocutory injunction proceedings against the contract award decision should notify the contracting authority in writing before the stipulated time limit expires, and send a copy of the summons (dagvaarding), stating the date on which the judge hearing applications for provisional relief will hear the case. 14

15 32.Unless there are very urgent reasons for not doing so, the NRO will await the court s decision on the application for an interlocutory injunction. If the decision on the application for an interlocutory injunction has no impact on the contract award decision, the award of the contract to the tenderer to which the contract was awarded provisionally will become final. 33.In the event of a dispute between parties to this contract award procedure arising from the procedure, including a dispute that only one of the parties involved regards as such, the competent court will be The Hague District Court. 34.Consultants that are or have been involved with the implementation of this program are not eligible to be hired for an evaluation or assessment of this program. 15

Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014

Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 adopted by the Norwegian Ministry of Foreign Affairs pursuant to Article 8.8 of the Agreement between the Kingdom of Norway

More information

Kingdom of the Netherlands

Kingdom of the Netherlands Kingdom of the Netherlands GENERAL GOVERNMENT PURCHASING CONDITIONS 2014 (ARIV 2014) Adopted by order of the Prime Minister, Minister of General Affairs, of 26 March 2014, no. 3132081 I General Article

More information

General Government Terms and Conditions for Public Service Contracts 2011 (ARVODI 2011)

General Government Terms and Conditions for Public Service Contracts 2011 (ARVODI 2011) General Government Terms and Conditions for Public Service Contracts 2011 (ARVODI 2011) Adopted by order of the Prime Minister, Minister of General Affairs, of 7 June 2011, no. 3104145 (Government Gazette

More information

DRV Accountants & Adviseurs General terms and conditions Corporate Finance Versie 01-03-12 1

DRV Accountants & Adviseurs General terms and conditions Corporate Finance Versie 01-03-12 1 Filed with the Rotterdam Chamber of Commerce in Rotterdam on 26 March 2009 under number 24117094. Internet: www.drvcf.nl Offices in: Rotterdam Hoofdweg 52 P.O. Box 8560-3009 AN Rotterdam, Netherlands Telephone:

More information

Open Invitation to Tender

Open Invitation to Tender NAFTA a. s., Votrubova 1, 820 09 Bratislava Open Invitation to Tender (Bidding Terms and Conditions) This invitation to tender is being published under Section 281 et seq. of Act No 513/1991, the Commercial

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014 the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

General Terms and Conditions

General Terms and Conditions General Terms and Conditions ARTICLE 1: GENERAL 1. Definitions In these General Terms and Conditions unless the context otherwise requires: a. Agreement means any agreement entered into by the EAIE with

More information

SERVICE CONTRACT NOTICE. Development of a sustainable information system for MAFWM Location - Serbia

SERVICE CONTRACT NOTICE. Development of a sustainable information system for MAFWM Location - Serbia Ref. Ares(2013)2579227-05/07/2013 Public document to be completed by the Contracting Authority SERVICE CONTRACT NOTICE Development of a sustainable information system for MAFWM Location - Serbia 1. Publication

More information

SERVICE CONTRACT NOTICE Framework Service Contract for Vehicle Insurance Services no.4 Kosovo

SERVICE CONTRACT NOTICE Framework Service Contract for Vehicle Insurance Services no.4 Kosovo Public document to be completed by the Contracting Authority SERVICE CONTRACT NOTICE Framework Service Contract for Vehicle Insurance Services no.4 Kosovo Please note that the awarding of the contract

More information

General Terms of Purchase. of HAN University of Applied Sciences

General Terms of Purchase. of HAN University of Applied Sciences General Terms of Purchase of HAN University of Applied Sciences HAN-Terms of Purchase; Page 1 of 6 Versie14 september 2010 Content Article 1 Definitions Article 2 Quotation; Creation Article 3 Applicability

More information

Terms & Conditions Verder B.V. (02031806) Filed at the Chamber of Commerce on 29-01-2015

Terms & Conditions Verder B.V. (02031806) Filed at the Chamber of Commerce on 29-01-2015 Terms & Conditions Verder B.V. (02031806) Filed at the Chamber of Commerce on 29-01-2015 1. General 1.1 These terms and conditions use the following terms and definitions: Product: items, as well as services

More information

Article 2. Offers and quotations

Article 2. Offers and quotations 1 Article 1. General 1. These terms and conditions apply to all offers, quotations and agreements between Smets Food Trading B.V., with registered offices in (6131 GR) Sittard, at Odasingel 473, hereinafter

More information

Government of the Netherlands

Government of the Netherlands Government of the Netherlands General Government Terms and Conditions for Public Service Contracts 2014 (ARVODI 2014), adopted by order of the Prime Minister, Minister of General Affairs, of 26 march 2014,

More information

the Government Gazette [Staatscourant] Complimentary English Translation of the Authentic Dutch text, adjustments included, 10 th July 2012

the Government Gazette [Staatscourant] Complimentary English Translation of the Authentic Dutch text, adjustments included, 10 th July 2012 > Return address PO Box 20101 2500 EC The Hague the Government Gazette [Staatscourant] Our reference: Complimentary English Translation of the Authentic Dutch text, adjustments included, 10 th July 2012

More information

GENERAL TERMS AND CONDITIONS

GENERAL TERMS AND CONDITIONS GENERAL TERMS AND CONDITIONS OF: Europe Retail Packing BV ABC Westland 315 2685 DD Poeldijk hereinafter to be referred to as: ERP Article 1 Definitions 1. In the present general terms and conditions, the

More information

Eskom Holdings SOC Ltd s Standard Conditions of Tender

Eskom Holdings SOC Ltd s Standard Conditions of Tender 1. General Actions 1 The Employer, the Eskom Representative and each eligible er submitting a shall act timeously, ethically and in a manner which is fair, equitable, transparent, competitive and cost-effective.

More information

Article 1: Subject. Article 2: Orders - Order Confirmation

Article 1: Subject. Article 2: Orders - Order Confirmation GENERAL CONDITIONS OF PURCHASE Article 1: Subject 1.1 The following general conditions of purchase (the "General Conditions") establish the contractual conditions governing the purchase of raw materials,

More information

General Terms and Conditions for Service companies

General Terms and Conditions for Service companies for Service companies Applicable to the provision of services and the delivery of goods by members facility companies of the listed trade association. These general conditions of sale and delivery shall

More information

BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS

BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Labour Law BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES

More information

Liverpool City Region Local Enterprise Partnership Request for Written Quotation. for. Mobile telephone contract. July 2015

Liverpool City Region Local Enterprise Partnership Request for Written Quotation. for. Mobile telephone contract. July 2015 Liverpool City Region Local Enterprise Partnership Request for Written Quotation for Mobile telephone contract July 2015 Contents Section 1. INTRODUCTION Background and summary/overview of requirements

More information

SERVICE CONTRACT NOTICE TRAVEL AGENCY SERVICES Location: Barcelona /Spain UfM Member States

SERVICE CONTRACT NOTICE TRAVEL AGENCY SERVICES Location: Barcelona /Spain UfM Member States SERVICE CONTRACT NOTICE TRAVEL AGENCY SERVICES Location: Barcelona /Spain UfM Member States Common procurement vocabulary (CPV) 63510000 - Travel agency and similar services 1) Publication reference UfMS/iRP/0003/2014

More information

General Terms and Conditions of the Association of Dutch Designers (BNO) January 2005

General Terms and Conditions of the Association of Dutch Designers (BNO) January 2005 General Terms and Conditions of the Association of Dutch Designers (BNO) January 2005 1 Agreement, offers and confirmation 1.1 These General Terms and Conditions apply to the exclusion of any purchase

More information

Tender specifications. Framework contract for Redundant Internet access. Open call for tender EEA/OSE/09/006

Tender specifications. Framework contract for Redundant Internet access. Open call for tender EEA/OSE/09/006 Annex I Tender specifications Framework contract for Redundant Internet access Open call for tender EEA/OSE/09/006 1. Purpose The purpose of this call is to award a framework contract for a period of six

More information

SCOPE OF APPLICATION AND DEFINITIONS

SCOPE OF APPLICATION AND DEFINITIONS Unofficial translation No. 398/1995 Act on Foreign Insurance Companies Issued in Helsinki on 17 March 1995 PART I SCOPE OF APPLICATION AND DEFINITIONS Chapter 1. General Provisions Section 1. Scope of

More information

General Terms and Conditions of the Association of Dutch Designers (BNO) February 2013

General Terms and Conditions of the Association of Dutch Designers (BNO) February 2013 General Terms and Conditions of the Association of Dutch Designers (BNO) February 2013 1 Agreement, offer and confirmation 1.1 These General Terms and Conditions ( General Terms and Conditions ) govern

More information

31/01/2013 S22 European Investment Bank - Service contract - Contract notice - Restricted procedure

31/01/2013 S22 European Investment Bank - Service contract - Contract notice - Restricted procedure 31/01/2013 S22 European Investment Bank - Service contract - Contract notice - Restricted procedure L-Luxembourg: EIB - Assistance to the Palestinian Water Authority (PWA) for the implementation of the

More information

General Terms and Conditions of ICTRecht

General Terms and Conditions of ICTRecht General Terms and Conditions of ICTRecht Version dated 1 September 2012 These General Terms and Conditions (the General Conditions ) govern each Contract with, and performance of work by, ICTRecht. Any

More information

URBACT III OPERATIONAL PROGRAMME (2014-2020) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS

URBACT III OPERATIONAL PROGRAMME (2014-2020) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS URBACT III OPERATIONAL PROGRAMME (2014-2020) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS Open 30 March 2015 16 June 2015 1 TABLE OF CONTENT INTRODUCTION... 3 SECTION 1 - ABOUT URBACT

More information

Contents: 1 General. 1 General. 2 Tenderer s obligations. 3 The Procuring Department s undertakings. Republic of Botswana. OF TENDER Feb 2006

Contents: 1 General. 1 General. 2 Tenderer s obligations. 3 The Procuring Department s undertakings. Republic of Botswana. OF TENDER Feb 2006 PUBLIC PROCUREMENT AND ASSET DISPOSAL BOARD STANDARDISED CONDITIONS OF TENDER Feb 2006 Contents: 1 General 2 Tenderer s obligations 3 The Procuring Department s undertakings 1 General Actions 1 The Procuring

More information

FOR INFORMATION PURPOSES ONLY

FOR INFORMATION PURPOSES ONLY On December 23, 2013, the debtor Metropolitní spořitelní družstvo v likvidaci, having its registered office at Balbínova 404/22, Prague 2, Postal Code 120 00, Identification Number: 255 71 150, registered

More information

Request for proposals (RFP) The supply of a computer based Library Management System for the CSIR. RFP No. 579/29/05/2015

Request for proposals (RFP) The supply of a computer based Library Management System for the CSIR. RFP No. 579/29/05/2015 Request for proposals (RFP) The supply of a computer based Library Management System for the CSIR RFP No. 579/29/05/2015 Date of Issue: 15 May 2015 Closing Date: Friday, 29 th May 2015 Place: Tender box,

More information

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2 is an integral part of the Framework Agreement between the Swiss Federal Council and the Government of the Republic of Poland

More information

Invitation for Expression of Interest

Invitation for Expression of Interest Invitation for Expression of Interest Consulting Services for the Transaction Advisory Services for involvement of operator being able to manage based on a lease contract in areas serviced by Yerevan Water

More information

HR-Zagreb: IPA digital archival information system software in the Agency for Medicinal Products and Medical Devices 2012/S 157-261208

HR-Zagreb: IPA digital archival information system software in the Agency for Medicinal Products and Medical Devices 2012/S 157-261208 1/5 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:261208-2012:text:en:html HR-Zagreb: IPA digital archival information system software in the Agency for Medicinal Products and Medical

More information

Europe Social Innovation Competition 2013 Prize Unlocking potential, creating new work --- Terms and Conditions

Europe Social Innovation Competition 2013 Prize Unlocking potential, creating new work --- Terms and Conditions EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Brussels, 28 September 2012 Europe Social Innovation Competition 2013 Prize Unlocking potential, creating new work --- Terms and Conditions

More information

AGREEMENT WITH A SELF-EMPLOYED CONTRACTOR FOR CONSULTANCY SERVICES

AGREEMENT WITH A SELF-EMPLOYED CONTRACTOR FOR CONSULTANCY SERVICES AGREEMENT WITH A SELF-EMPLOYED CONTRACTOR FOR CONSULTANCY SERVICES Names of Parties 1. (Company Name) of (Company Address) ( Consultancy ). 2. Redline Group Ltd of 26-34 Liverpool Road, Luton. Beds LU1

More information

June 11th, 2014 1. INTRODUCTION

June 11th, 2014 1. INTRODUCTION INVITATION FOR SUBMISSION OF PROPOSALS FOR THE CIVIL LIABILITY INSURANCE COVERAGE OF DIRECTORS AND OFFICERS OF THE HELLENIC FINANCIAL STABILITY FUND (HFSF) June 11th, 2014 1. INTRODUCTION HFSF is a private

More information

North American Development Bank. Model Prequalification Document: Prequalification of Contractors

North American Development Bank. Model Prequalification Document: Prequalification of Contractors North American Development Bank Model Prequalification Document: Prequalification of Contractors 2 Preface Procurement under projects financed by the North American Development Bank (the Bank), is carried

More information

GENERAL TERMS AND CONDITIONS

GENERAL TERMS AND CONDITIONS GENERAL TERMS AND CONDITIONS Contents A. SCOPE...3 B. CONFIDENTIALITY, NAME, INTELLECTUAL PROPERTY AND TAX EXEMPT STATUS OF THE WTO...3 B.1. Confidentiality...3 B.2. Use of the name, logo or official seal

More information

General Terms and Conditions of Sale and Delivery of Federatie Aandrijven en Automatiseren (Trading Companies)

General Terms and Conditions of Sale and Delivery of Federatie Aandrijven en Automatiseren (Trading Companies) General Terms and Conditions of Sale and Delivery of Federatie Aandrijven en Automatiseren (Trading Companies) Filed at the Registry of the Court of The Hague, the Netherlands, on 6 December 2011, under

More information

ACT on Payment Services 1 ) 2 ) of 19 August 2011. Part 1 General Provisions

ACT on Payment Services 1 ) 2 ) of 19 August 2011. Part 1 General Provisions ACT on Payment Services 1 ) 2 ) of 19 August 2011 Part 1 General Provisions Article 1. This Act sets out rules for the provision of payment services, including: 1) the conditions for provision of payment

More information

Expression of Interest (EoI) Design, Development and Maintenance of New Mobile Application for National Institute of Solar Energy, Gurgaon

Expression of Interest (EoI) Design, Development and Maintenance of New Mobile Application for National Institute of Solar Energy, Gurgaon Expression of Interest (EoI) Design, Development and Maintenance of New Mobile Application for National Institute of Solar Energy, Gurgaon Please send/submit separate Annexure-1 (Technical Bid) and Annexure-2

More information

Invitation to Tender

Invitation to Tender Invitation to Tender Provision of Training in Technology Transfer and Related Areas for The Southern Africa Innovation Support Programme 1. Drawing up the tender The tender must be submitted in writing

More information

Video Production Services for the Ontario College of Trades (the College)

Video Production Services for the Ontario College of Trades (the College) Video Production Services for the Ontario College of Trades (the College) Request for Proposal (RFP) No. OCOT/CM/2014-03 Date Issued: 14 April 2014 1 TABLE OF CONTENTS A. INTRODUCTION...4 1. Objective...

More information

External aid programmes - Service contract - Contract notice - Restricted procedure

External aid programmes - Service contract - Contract notice - Restricted procedure 1/5 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:340372-2010:text:en:html HR-Zagreb: IPA preparation of the 'Han Agency marketing plan' and 'Plan of sustainable economic development

More information

*********************

********************* DOCUMENT No.3 attached to the letter of invitation to tender EUROPEAN COMMISSION AGRICULTURE DIRECTORATE GENERAL Directorate F. Horizontal aspects of rural development; SAPARD F.3. Consistency of rural

More information

GENERAL CONDITIONS OF THE FEDERAL DEPARTMENT OF FOREIGN AFFAIRS FOR LOCAL MANDATES

GENERAL CONDITIONS OF THE FEDERAL DEPARTMENT OF FOREIGN AFFAIRS FOR LOCAL MANDATES Annex 3 GENERAL CONDITIONS OF THE FEDERAL DEPARTMENT OF FOREIGN AFFAIRS FOR LOCAL MANDATES 1. Phase Prior to Contract Conclusion 1.1. Up to the conclusion of the contract, withdrawal from the negotiations

More information

GENERAL TERMS AND CONDITIONS OF SALE AND DELIVERY SENSUS

GENERAL TERMS AND CONDITIONS OF SALE AND DELIVERY SENSUS Article 1 Applicability GENERAL TERMS AND CONDITIONS OF SALE AND DELIVERY SENSUS 1.1 These terms and conditions are used by Sensus B.V., as well as by its affiliated companies, hereinafter referred to

More information

TENDER SPECIFICATIONS

TENDER SPECIFICATIONS EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR EDUCATION AND CULTURE Youth and sport; Erasmus+ Traineeships Office INTERINSTITUTIONAL CALL FOR TENDERS OPEN PROCEDURE N EAC/05/2014 COLLECTIVE HEALTH INSURANCE

More information

Expression of Interest (EoI) Design, Development and Maintenance of New Website for National Institute of Solar Energy, Gurgaon

Expression of Interest (EoI) Design, Development and Maintenance of New Website for National Institute of Solar Energy, Gurgaon Expression of Interest (EoI) Design, Development and Maintenance of New Website for National Institute of Solar Energy, Gurgaon Please send/submit separate Annexure-1 (Technical Bid) and Annexure-2 (Financial

More information

Dated 29 February 2016. Flood Re Limited. Payments Dispute Process. Version 1.0

Dated 29 February 2016. Flood Re Limited. Payments Dispute Process. Version 1.0 Dated 29 February 2016 Flood Re Limited Payments Dispute Process Version 1.0 1. General 1.1 The following provisions will apply to all disputes referred to and conducted under this Payments Dispute Resolution

More information

SPECIAL CONDITIONS FOR THE UPGRADE OF EXISTING MICROSOFT EXCHANGE SERVER 2003 TO MICROSOFT EXCHANGE SERVER 2010

SPECIAL CONDITIONS FOR THE UPGRADE OF EXISTING MICROSOFT EXCHANGE SERVER 2003 TO MICROSOFT EXCHANGE SERVER 2010 SPECIAL CONDITIONS FOR THE UPGRADE OF EXISTING MICROSOFT EXCHANGE SERVER 2003 TO MICROSOFT EXCHANGE SERVER 2010 1.0 Scope of Tender These specifications and conditions detail the basic requirements for

More information

INTERNATIONAL DEVELOPMENT COMMITTEE

INTERNATIONAL DEVELOPMENT COMMITTEE INTERNATIONAL DEVELOPMENT COMMITTEE OF THE COUNCIL OF MINISTERS MULTI-YEAR GRANT APPLICATION GUIDANCE External Relations Division Government Office, Bucks Road Douglas, Isle of Man, IM1 3PN January 2015

More information

T: +43-(0)590900-3540 F: +43-(0)590900-3178 e-mail: ubit@wko.at http://www.ubit.at

T: +43-(0)590900-3540 F: +43-(0)590900-3178 e-mail: ubit@wko.at http://www.ubit.at Professional Association of Management Consultancy and Information Technology (Fachverband Unternehmensberatung und Informationstechnologie) Wiedner Hauptstraße 63 A-1045 Vienna T: +43-(0)590900-3540 F:

More information

CHAPTER I I. Formation of a limited liability company CHAPTER I. GENERAL PROVISIONS

CHAPTER I I. Formation of a limited liability company CHAPTER I. GENERAL PROVISIONS Law of the Republic of Kazakhstan dated April 22, 1998 220-I On limited liability companies and additional liability companies (with alterations and amendments as of 29.12.2014) CHAPTER I. General provisions

More information

GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS

GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS Japan International Cooperation Agency (JICA) December 2006 (Amended December 2009) version 1.0 CONTENTS INTRODUCTION...

More information

Length of Contract: 2 months (with an option to extend for a further 5 months).

Length of Contract: 2 months (with an option to extend for a further 5 months). 1. Introduction The Joint Workplace Solution (JWS) team will shortly complete the migration of some 2000 users from SharePoint 2007 to 20 and alongside this a programme of developing a series of line-of-business

More information

Guide to the VAT mini One Stop Shop

Guide to the VAT mini One Stop Shop EUROPEAN COMMISSION DIRECTORATE-GENERAL TAXATION AND CUSTOMS UNION Indirect Taxation and Tax administration VAT Brussels, 23 October 2013 Guide to the VAT mini One Stop Shop Table of Contents Background...

More information

SPECIFICATIONS AND CONDITIONS FOR THE PROVISION OF GRIT BLASTING SERVICES

SPECIFICATIONS AND CONDITIONS FOR THE PROVISION OF GRIT BLASTING SERVICES SPECIFICATIONS AND CONDITIONS FOR THE PROVISION OF GRIT BLASTING SERVICES 1. SCOPE 1.1 This tender calls for the provision of grit blasting services of metal components to the desalination section of the

More information

Align Technology. Data Protection Binding Corporate Rules Processor Policy. 2014 Align Technology, Inc. All rights reserved.

Align Technology. Data Protection Binding Corporate Rules Processor Policy. 2014 Align Technology, Inc. All rights reserved. Align Technology Data Protection Binding Corporate Rules Processor Policy Confidential Contents INTRODUCTION TO THIS POLICY 3 PART I: BACKGROUND AND ACTIONS 4 PART II: PROCESSOR OBLIGATIONS 6 PART III:

More information

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer Conditions of Offer A1 The offer documents comprise the offer form, letter of invitation to offer (if any), these Conditions of Offer and Conditions of Contract (Works & Services), the Working with Queensland

More information

General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES

General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES General Terms of Public Procurement in Service Contracts January 2015 Contents Introduction...3 Issues to be observed in applying...5 General Terms of Public Procurement in Service Contracts ()...9 1 Definitions...9

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. COMMISSION REGULATION (EC) No /..

COMMISSION OF THE EUROPEAN COMMUNITIES. COMMISSION REGULATION (EC) No /.. EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XX/XX/2007 COM(2006) XXX COMMISSION REGULATION (EC) No /.. of [ ] implementing Council Regulation (EC) No 1085/2006 establishing an instrument

More information

How To Write A Report On A Recipe Card

How To Write A Report On A Recipe Card Opinion on a notification for Prior Checking received from the Data Protection Officer of the European Investment Bank (EIB) concerning procedures related to "360 Leadership feedback report" Brussels,

More information

RULES. MultiCash Electronic Customer Service System

RULES. MultiCash Electronic Customer Service System RULES MultiCash Electronic Customer Service System Warsaw May 2015 Table of Contents CHAPTER 1 GENERAL PROVISIONS... 3 CHAPTER 2 CONDITIONS FOR MAKING THE MULTICASH SYSTEM AVAILABLE... 4 CHAPTER 3 MAKING

More information

General Terms and Conditions of Peak Payroll Services B.V. In these General Terms and Conditions:

General Terms and Conditions of Peak Payroll Services B.V. In these General Terms and Conditions: General Terms and Conditions of Peak Payroll Services B.V. Article 1 General In these General Terms and Conditions: 1. The Client refers to the party issuing the assignment, and 2. Peak refers to the company

More information

Third EU Health Programme 2014-2020

Third EU Health Programme 2014-2020 Third EU Health Programme 2014-2020 Procurement and Service contracts Dirk MEUSEL European Commission Health, Agriculture and Food (Chafea) Luxembourg Overview Major differences of service contracts to

More information

GRTGAZ NETWORK TRANSMISSION CONTRACT

GRTGAZ NETWORK TRANSMISSION CONTRACT Page 1 of 9 GRTGAZ NETWORK TRANSMISSION CONTRACT APPENDIX A3 STANDARD EVIDENCE AGREEMENT English translation for information. Disclaimer The present translation is not binding and is provided by GRTgaz

More information

How To Fund A Project

How To Fund A Project PREPARATORY ACTION IN THE FIELD OF SPORT Administrative and Financial Management Handbook The rules outlined in this Administrative and Financial Handbook apply to the projects funded by the Preparatory

More information

28 September 2007 LIFELONG LEARNING PROGRAMME GUIDE FOR APPLICANTS: ADMINISTRATIVE AND FINANCIAL RULES

28 September 2007 LIFELONG LEARNING PROGRAMME GUIDE FOR APPLICANTS: ADMINISTRATIVE AND FINANCIAL RULES 28 September 2007 LIFELONG LEARNING PROGRAMME GUIDE FOR APPLICANTS: ADMINISTRATIVE AND FINANCIAL RULES 1 Table of Content 2 1. GENERAL PROVISIONS This document contains supplementary information to the

More information

The certification process

The certification process TS004(COS)v01 The certification process for COSMOS standard Standard in force available on www.cosmos-standard.org or sent on request. 1 Contents I. When to apply... 3 II. The different steps in the certification

More information

Consultants Services, Lump-Sum Remuneration

Consultants Services, Lump-Sum Remuneration 1 S T A N D A R D F O R M O F C O N T R A C T FOR Consultants Services, Lump-Sum Remuneration CONTRACT FOR CONSULTANTS SERVICES Lump-Sum Remuneration Between [name of the Procuring Entity] and 2 [name

More information

Request for Proposals (RFP) Strategic Education Consulting Services December 2012 FILING DEADLINE: DECEMBER 21, 2012 (5 P.M. EST)

Request for Proposals (RFP) Strategic Education Consulting Services December 2012 FILING DEADLINE: DECEMBER 21, 2012 (5 P.M. EST) Request for Proposals (RFP) Strategic Education Consulting Services December 2012 FILING DEADLINE: DECEMBER 21, 2012 (5 P.M. EST) I. PROJECT OVERVIEW As a public media system leader, one of the Corporation

More information

Frequent Asked Questions related to tender EU-OSHA/CPU/2013/T3

Frequent Asked Questions related to tender EU-OSHA/CPU/2013/T3 Web and ICT services The Agency will be closed from 24/12/2013 until 01/01/2014 (both inclusive) Please note there was a typo on the date of opening session (see 1.8 of the technical specifications) The

More information

Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors

Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors Procurement guidance Engaging and managing consultants Includes definitions for consultants and contractors Procurement guidance: Engaging and managing consultants Page 2 of 17 Table of contents Table

More information

CONTRACT SPECIFICATION

CONTRACT SPECIFICATION Public document to be completed by the Contracting Authority SERVICE CONTRACT NOTICE Support to the Regional Authorising Officer (ECOWAS Commission) in the implementation of European Development Fund projects

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL HOME AFFAIRS. Directorate B - Migration, Asylum. Preparatory Action HOME/2013/CFP/PARS

EUROPEAN COMMISSION DIRECTORATE-GENERAL HOME AFFAIRS. Directorate B - Migration, Asylum. Preparatory Action HOME/2013/CFP/PARS EUROPEAN COMMISSION DIRECTORATE-GENERAL HOME AFFAIRS Directorate B - Migration, Asylum Preparatory Action Network of contacts and discussion between targeted municipalities and local authorities on experiences

More information

MASTER ADVERTISING AGREEMENT

MASTER ADVERTISING AGREEMENT MASTER ADVERTISING AGREEMENT THE UNDERSIGNED: 1. [ ] B.V., registered in the trade register with the number [ ], having its registered office in Voorburg, legally represented in this matter by Mr. R. Van

More information

STUDENT LOAN INFORMATION

STUDENT LOAN INFORMATION STUDENT LOAN INFORMATION 1. Data of the creditor Creditor Address Activity licence Telephone number E-mail Fax number Web address Membership in associations Supervisory authority Swedbank AS, registered

More information

TERMS OF REFERENCE (ToR s) REQUEST FOR PROPOSALS TO PROVIDE SIMPLE SMALL BUSINESS FINANCIAL MANAGEMENT SOFTWARE (SSBFMS) October 2010

TERMS OF REFERENCE (ToR s) REQUEST FOR PROPOSALS TO PROVIDE SIMPLE SMALL BUSINESS FINANCIAL MANAGEMENT SOFTWARE (SSBFMS) October 2010 TERMS OF REFERENCE (ToR s) REQUEST FOR PROPOSALS TO PROVIDE SIMPLE SMALL BUSINESS FINANCIAL MANAGEMENT SOFTWARE (SSBFMS) October 2010 INDEX PAGE 1. INSTRUCTION TO BIDDERS 2 1.1 ALTERATION OR WITHDRAWAL

More information

TENDER INSTRUCTIONS Consulting services and auction software in connection with the 1800 MHz auction. 23 March 2015 Case no.

TENDER INSTRUCTIONS Consulting services and auction software in connection with the 1800 MHz auction. 23 March 2015 Case no. TENDER INSTRUCTIONS Consulting services and auction software in connection with the 1800 MHz auction 23 March 2015 Case no. 2015-2800 Table of contents List of annexes... 3 1. The overall framework for

More information

Invitation of expressions of interest for the provision of insurance cover

Invitation of expressions of interest for the provision of insurance cover Invitation of expressions of interest for the provision of insurance cover 1. Context and Overview 1.1. The Authority The Irish Auditing and Accounting Supervisory Authority ( IAASA ) is the independent

More information

General Conditions Latest update: February 12, 2016

General Conditions Latest update: February 12, 2016 General Conditions Latest update: February 12, 2016 Herein you will find the General Conditions of AttachingIT. These are applicable in case you receive a service from AttachingIT. We advise you to read

More information

Supply Chain Plan Final Guidance

Supply Chain Plan Final Guidance Supply Chain Plan Final Guidance For projects of 300MW or more applying for a Contract for Difference as part of the Electricity Market Reform programme August 2014 Crown copyright 2014 URN 14D/283 You

More information

Tender Specifications. for. Development of a web-based dashboard for European surveillance data including ArcGIS based maps

Tender Specifications. for. Development of a web-based dashboard for European surveillance data including ArcGIS based maps Tender Specifications for Development of a web-based dashboard for European surveillance data including ArcGIS based maps Direct service contract Publication Reference: OJ/26/08/2013-PROC/2013/018 August,

More information

Standard Terms of Engagement. and. Terms of Business

Standard Terms of Engagement. and. Terms of Business Standard Terms of Engagement and Terms of Business Contents 1. Standard Terms of Engagement of Keirs Carr... 4 1.1 Accounting Services... 4 Accounting Services... 4 Compilation of Financial Statements...

More information

Terms and Conditions of International Money Transfer Transactions by Card Members

Terms and Conditions of International Money Transfer Transactions by Card Members Terms and Conditions of International Money Transfer Transactions by Card Members (For City Express) When using the Card International Money Transfer Service for Card Members provided by SBI Remit Co.,

More information

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME GUIDANCE NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP VERSION 1 APPROVED

More information

General terms and conditions of delivery Publi-Air the Netherlands Ltd. Intellectual ownership Nature and duration of the agreement

General terms and conditions of delivery Publi-Air the Netherlands Ltd. Intellectual ownership Nature and duration of the agreement Article 1. Definitions General terms and conditions of delivery Publi-Air the Netherlands Ltd. Intellectual ownership Nature and duration of the agreement 1. The client is referred to as the person who

More information

Anglo American Procurement Solutions Site

Anglo American Procurement Solutions Site Anglo American Procurement Solutions Site Event Terms and Conditions Anglo American Procurement Solutions Site Event Terms and Conditions Event Terms and Conditions 3 1. Defined terms 3 2. Interpretation

More information

GENERAL TERMS AND CONDITIONS FOR COMMISSIONS TO TNO

GENERAL TERMS AND CONDITIONS FOR COMMISSIONS TO TNO GENERAL TERMS AND CONDITIONS FOR COMMISSIONS TO TNO SEPTEMBER 2010 GENERAL TERMS AND CONDITIONS FOR COMMISSIONS TO TNO SEPTEMBER 2010 Table of Contents 1. TNO definitions. 2 2. General matters to be taken

More information

STATUTE OF THE COMMONWEALTH SECRETARIAT ARBITRAL TRIBUNAL

STATUTE OF THE COMMONWEALTH SECRETARIAT ARBITRAL TRIBUNAL STATUTE OF THE COMMONWEALTH SECRETARIAT ARBITRAL TRIBUNAL Adopted by Commonwealth Governments on 1 July 1995 and amended by them on 24 June 1999, 18 February 2004, 14 May 2005, 16 May 2007 and 28 May 2015.

More information

Records Information Management System Development and Implementation

Records Information Management System Development and Implementation ENQUIRIES: SUPPLY CHAIN MANAGEMENT UNIT TEL NO. : + 27 (0)11 830 2200 FAX NO. : + 27 (0)11 830 2201 EMAIL : procurement@mgsl.co.za WEBSITE : www.mgslg.co.za 40 Hull Street, Cnr. 8th Street and Hull Streets

More information

BUILDING MAINTENANCE. Tender for Supply and Installation of Inverter Based AC Units (Split Units) for PWD Workshop Store Room and Office

BUILDING MAINTENANCE. Tender for Supply and Installation of Inverter Based AC Units (Split Units) for PWD Workshop Store Room and Office BUILDING MAINTENANCE Tender for Supply and Installation of Inverter Based AC Units (Split Units) for PWD Workshop Store Room and Office August 2015 Instructions to Tenderers 1. The contract conditions

More information

UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT NOTICE. Services

UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT NOTICE. Services 1/6 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:273114-2011:text:en:html UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT

More information

CENTRAL INFORMATION COMMISSION BLOCK IV, 5 TH FLOOR, OLD JNU CAMPUS, NEW DELHI-110067 TENDER DOCUMENT

CENTRAL INFORMATION COMMISSION BLOCK IV, 5 TH FLOOR, OLD JNU CAMPUS, NEW DELHI-110067 TENDER DOCUMENT CENTRAL INFORMATION COMMISSION BLOCK IV, 5 TH FLOOR, OLD JNU CAMPUS, NEW DELHI-110067 TENDER DOCUMENT REQUEST FOR PROPOSAL For Scanning, Digitization of Documents/Files along with software facility for

More information

Guide to procurement of consulting services

Guide to procurement of consulting services Guide to procurement of consulting services Last updated: April 2014 Table of contents Preliminary remarks 4 1. Implementation of German contribution to an international cooperation measure by consulting

More information

GENERAL TERMS OF ORDERS AND DEFINITIONS FOR A PROFESSIONAL INVESTOR. April 2007

GENERAL TERMS OF ORDERS AND DEFINITIONS FOR A PROFESSIONAL INVESTOR. April 2007 1 I. SCOPE OF APPLICATION OF THE GENERAL TERMS OF ORDERS AND DEFINITIONS 1 Purpose and scope of application of the Terms of Orders These Terms of Orders shall be applied to the Order Relationship on the

More information

Transport for London. INVITATION TO TENDER FOR BRIDGE DESIGN CONSULTANCY SERVICES ITT REF: TfL/90711 PUBLICATION DATE: 13 FEBRUARY 2013

Transport for London. INVITATION TO TENDER FOR BRIDGE DESIGN CONSULTANCY SERVICES ITT REF: TfL/90711 PUBLICATION DATE: 13 FEBRUARY 2013 Transport for London INVITATION TO TENDER FOR BRIDGE DESIGN CONSULTANCY SERVICES ITT REF: TfL/90711 PUBLICATION DATE: 13 FEBRUARY 2013 Invitation to Tender TfL/90711 Bridge Design Consultancy Services

More information