ANGORA FIRE RESTORATION PROJECT
|
|
- Cory Harris
- 2 years ago
- Views:
Transcription
1 ANGORA FIRE RESTORATION PROJECT U.S. Forest Service LAKE TAHOE BASIN MANAGEMENT UNIT Duncan Leao Vegetation Management Planner Richard Vacirca Forest Aquatics Biologist
2 3 PHASES OF FIRE REHAB Phase I Rehab: Immediate post-fire actions Termed mop-up Hand/dozer lines, roads, safety zones, portions of urban lots Phase II Rehab: Burned Area Emergency Rehab (BAER) Erosion control measures Fall/Winter storm events Noxious weed detection surveys Phase III Rehab: Public safety & Long-term restoration Angora Hazard Tree Removal Project (urban lots/roads/trails) Angora Fire Restoration Project
3 WHY HERE? WHY NOW? CONSIDERATIONS: Pre-fire + post-fire conditions influence whether or not we are currently at or will eventually meet desired conditions WITHOUT active management. Impacts prior to the fire - Roads/trails in SEZs; ; Stream straightening; Fire suppression affecting fuel loading Impacts post-fire - Loss of vegetation/ground cover to conserve soils - Further effects to resources from future fire and/or floods + Increase in water availability + Increase in riparian vegetation
4 DESIRED CONDITIONS - EXAMPLES POST-FIRE (> 20 YEARS) Fire, Fuels, Vegetation and Forest Management Stand conditions in the defense zone are fairly open dominated by large, fire tolerant trees with an overall average fuel loading of < 15 tons/acre. Wildlife Habitat Maintain sufficient levels of snags and down logs to provide some characteristics of diverse forest habitat. Watershed and Aquatic The connections of floodplains, channels, and water tables distribute flood flows and sustain diverse habitats. Roads and Trails The transportation system will provide non-motorized public access to the National Forest. Roads and trails retained in the system will be improved to meet Forest Service standards necessary for water quality protection.
5 PROPOSED ACTIONS VEGETATION/FUELS
6 PROPOSED ACTIONS ASPEN
7 PROPOSED ACTIONS WATERSHED/AQUATICS
8 PROPOSED ACTIONS ROADS/TRAILS
9 SUMMARY OF PROPOSED ACTIONS FUELS/FOREST HEALTH Ground based removal = up to 951 acres Aerial removal = up to 447 acres Reforestation = up to 1,100 acres WILDLIFE HABITAT Wildlife Habitat Management Zones project design Aspen (conifer removal) 1 stand/< 5 acres Aspen (planting) 11 plots/1/4 acre WATERSHED AND AQUATIC Channel reconstruction (Angora Creek) - ~1200 feet (0.23 miles) Large wood placement (Angora Creek + Tribs) - ~ 2 miles Gardner Mountain Meadow 13 acres/~1500 feet (est.) Wetland complex (Seneca Pond) 5-10 acres (est.)
10 SUMMARY OF PROPOSED ACTIONS CONT. ROADS AND TRAILS System roads upgrades = BMPs,, move out of SEZs, decommission, etc. Non-system roads upgrades = decommission, reconstruct + adopt Trails new construction, reroute + BMPs on existing, decommission, way-finding signage NOXIOUS WEEDS Manuel treatment methods (bull thistle) acres (est.)
Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program
Angora Fire Restoration Activities June 24, 2007 Presented by: Judy Clot Forest Health Enhancement Program California Tahoe Conservancy Independent California State Agency within the Resources Agency Governed
King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement.
This document is scheduled to be published in the Federal Register on 12/24/2014 and available online at http://federalregister.gov/a/2014-30158, and on FDsys.gov [3410-11- P] DEPARTMENT OF AGRICULTURE
Nevada Pinyon-Juniper Partnership Proposed Demonstration Area A Brief Introduction. Presented by Jeremy Drew Project Manager Resource Concepts, Inc.
Nevada Pinyon-Juniper Partnership Proposed Demonstration Area A Brief Introduction Presented by Jeremy Drew Project Manager Resource Concepts, Inc. What I ll Discuss: Purpose of a Demonstration Area Priorities
Waldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012
Mark Shea Watershed Planning Supervisor August 23, 2012 Fire Started: Saturday June 23, 2012 Fire Progression June 23 2500 acres June 24 3600 acres June 25 4500 acres June 26 15622 acres June 27-28
Hayman Restoration Partnership
TREASURED LANDSCAPES, UNFORGETTABLE EXPERIENCES Hayman Restoration Partnership Post-Fire Restoration of the Hayman Fire Burn Area Pike National Forest, Colorado 2009-2014 Final Site Report Partners Supporters
LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE
Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE
WORKSHOP SUMMARY REPORT 1
Climate Change Vulnerability Assessment & Adaptation Strategies for Sierra Nevada Resources Sierra Nevada Workshop Series October 14-17, 2014 WORKSHOP SUMMARY REPORT 1 Photo: ESA 1 Authors: Jessi Kershner
Roaring Fork Valley Restoration Strategy
Roaring Fork Valley Restoration Strategy Future Forest Roundtable Future Forest Roundtable Roaring Fork Valley Restoration Strategy T he restoration strategy in the Roaring Fork Valley of the White River
Restoration Planning and Development of a Restoration Bank
Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration
May 9, 2005. Draft Environmental Impact Statement for Power Fire Restoration Project (CEQ# 050111)
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION IX 75 Hawthorne Street San Francisco, CA 94105 John Berry Forest Supervisor Eldorado National Forest 100 Forni Road Placerville, CA. 95667 May 9, 2005
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
HFQLG Project Evaluation Form
HFQLG Evaluation Form Names: Watershed Restoration Defensible Fuel Profile Zone Loyalton Pines Wildland Urban Interface Fuels Reduction Types: Watershed Restoration - Implemented pond and plug restoration
Passive Restoration 101: Framework and Techniques Overview. Amy Chadwick, Great West Engineering August 26, 2015 Butte, America
Passive Restoration 101: Framework and Techniques Overview Amy Chadwick, Great West Engineering August 26, 2015 Butte, America What Defines Passive Restoration? Process-based, nature-driven Minimal equipment
Determination of NEPA Adequacy (DNA)
DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT OFFICE GRANTS PASS RESOURCE AREA 2164 NE SPALDING AVENUE GRANTS PASS, OR 97526 Determination of NEPA Adequacy (DNA) Office: Grants
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
18 voting members 44 stakeholders 114 email list. Senators: Wyden & Merkley Representative DeFazio
18 voting members 44 stakeholders 114 email list Senators: Wyden & Merkley Representative DeFazio State Representative Krieger State Senators: Roblan, Johnson, and Kruse Governor Brown s office County
NPS Burned Area Emergency Response (BAER) and Burned Area Rehabilitation (BAR) in the Southern California Landscape
NPS Burned Area Emergency Response (BAER) and Burned Area Rehabilitation (BAR) in the Southern California Landscape 2005 2007 2013 NPS in non-desert southern California 2007 2005 SMMNRA 154,000 acres May
Using an All lands Framework for Conservation of Ecosystem Services
Using an All lands Framework for Conservation of Ecosystem Services Robert Deal USDA Forest Service - PNW Research Station, Portland, OR Nikola Smith USDA Forest Service - Pacific Northwest Region, Portland,
The Teton Creek Restoration Project Summary:
The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens
Prioritizing Riparian Restoration at the Watershed, Reach and Site Scales. Richard R. Harris University of California, Berkeley Cooperative Extension
Prioritizing Riparian Restoration at the Watershed, Reach and Site Scales Richard R. Harris University of California, Berkeley Cooperative Extension Issues Riparian communities provide multiple benefits
Wildfire & Flash Flood Recovery NACo Justice & Public Safety Symposium January 2014
Wildfire & Flash Flood Recovery NACo Justice & Public Safety Symposium January 2014 Fall 2013 Jim Reid Executive Director Public Service El Paso County, Colorado Recovery Specific to Incident Recovery
Integrated Restoration Prioritization
Integrated Restoration Prioritization Habitat Restoration and Environmental Monitoring Projects Section Restoration Services Division Definition Restoration Prioritization is a process of combining various
Angeles National Forest Fiscal Year 2012
United States Department of Agriculture Forest Service Pacific Southwest Region October 2013 Angeles National Forest Fiscal Year 2012 Land Management Plan Monitoring and Evaluation Report III. Land Management
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: obropta@envsci.rutgers.edu
2009 Station Fire. Past. Present. Future. Successes and Challenges in Postfire Recovery
2009 Station Fire Past Present Future Successes and Challenges in Postfire Recovery Jody Noiron, U.S. Forest Service - December 2010 Angeles National Forest Statistics: The most urban National Forest in
Restoring Conservancy Lands Following the Angora Fire a Preliminary Assessment
Restoring Conservancy Lands Following the Angora Fire a Preliminary Assessment. Prepared by: Daylin Wade, California Tahoe Conservancy Susie Kocher, University of California Cooperative Extension January
Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets
SUPPORTING INFORMATION ASSOCIATED WITH THE ALLOCATION PRIORITIES FOR CLEAN WATER FUND BOARD Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets 1 Agriculture AAFM On-Farm Implementation
Pre- and Post-Wildfire Forest Management for Ecological Restoration and Fire Resiliency
Pre- and Post-Wildfire Forest Management for Ecological Restoration and Fire Resiliency Richard B. Standiford UC Berkeley, Center for Forestry standifo@berkeley.edu Review of Day One: Background Setting
Appendix J Online Questionnaire
Appendix J Online Questionnaire In accordance with the Paperwork Reduction Act, this questionnaire was approved by the Office of Management and Budget (OMB). The OMB control number and expiration date
Alternative (Flexible) Mitigation Options Proposed Rule - Revised
Alternative (Flexible) Mitigation Options Proposed Rule - Revised NC Association of Environmental Professionals June 9, 2011 Background Purposes Update rules due to required changes from statutes Put all
Colorado Natural Heritage Program
CNHP s mission is to preserve the natural diversity of life by contributing the essential scientific foundation that leads to lasting conservation of Colorado's biological wealth. Colorado Natural Heritage
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
Appendix A: Contractor Survey
Appendix A: Contractor Survey Interview Questions About the Business Name of the business/proprietor: Number of Employees: Time in existing location: General Work Please describe the type of work have
Blue Creek Fire Natural Resources Recovery Guide
Blue Creek Fire Natural Resources Recovery Guide This document will be frequently updated - If you find errors or omissions or wish to add your resource, please contact: Lisa Stearns at lisa.stearns@wwccd.net
September 25, 2015. Dear Concerned Citizen:
IN REPLY REFER TO 5400/1792 (ORC030) ORC00-TS-2016.0001 Cloud 19 CT Timber Sale DOI-BLM-OR-C030-2010-0001-EA Fairview NWFP Project Environmental Assessment September 25, 2015 Dear Concerned Citizen: United
Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org
Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Wetland study slide Water Quality NRE goals in watershed plans Protect habitat that remains.
MONITORING THE RECOVERY OF STREAMS IN THE SAN GABRIEL MOUNTAINS (CA) FOLLOWING THE LARGEST WILDFIRE IN LOS ANGELES COUNTY HISTORY: STATION FIRE - 2009
MONITORING THE RECOVERY OF STREAMS IN THE SAN GABRIEL MOUNTAINS (CA) FOLLOWING THE LARGEST WILDFIRE IN LOS ANGELES COUNTY HISTORY: STATION FIRE - 2009 Karin Patrick, Aquatic Bioassay & Consulting, Inc.
Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting
Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth
Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan
Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how
Local Steps Toward California s Watershed Program
Local Steps Toward California s Watershed Program Presented by Robert Meacher Plumas County Board of Supervisors Creating a Watershed Moment in a Watershed Movement Planning and Conservation League Legislative
Section 4 General Strategies and Tools
Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General
GAO WILDLAND FIRE REHABILITATION AND RESTORATION. Forest Service and BLM Could Benefit from Improved Information on Status of Needed Work
GAO United States Government Accountability Office Report to the Chairman, Subcommittee on Forests and Forest Health, Committee on Resources, House of Representatives June 2006 WILDLAND FIRE REHABILITATION
Wildlife Habitat Conservation and Management Program
Wildlife Habitat Conservation and Management Program Manual for Counties and Cities Oregon Department of Fish and Wildlife 2015 Table of Contents 1. Introduction Purpose of the habitat program Objective
Bruce Orr and Zooey Diggory S T I L L W A T E R S C I E N C E S. Tom Dudley U C S A N T A B A R B A R A
A case study from the lower Santa Clara River, CA: Strategic planning for control of Arundo donax and restoration of riparian vegetation in semi-arid landscapes Bruce Orr and Zooey Diggory S T I L L W
FORESTED VEGETATION. forests by restoring forests at lower. Prevent invasive plants from establishing after disturbances
FORESTED VEGETATION Type of strategy Protect General cold adaptation upland and approach subalpine forests by restoring forests at lower Specific adaptation action Thin dry forests to densities low enough
Potential Economic Benefits to Santa Ana River Watershed of Forest Restoration. Barbara Wyse, Senior Economist
Potential Economic Benefits to Santa Ana River Watershed of Forest Restoration Barbara Wyse, Senior Economist July 25, 2012 Presentation Overview Purpose / Motivation for Study Scope Approach FINDINGS!
WELCOME TO INTEGRATED RESOURCE RESTORATION: A focus on landscape scale restoration
WELCOME TO INTEGRATED RESOURCE RESTORATION: A focus on landscape scale restoration July 2012 WELCOME TO THE NATIONAL FOREST FOUNDATION WEB CONFERENCE ROOM! Everyone is on mute in order to eliminate background
Considerations of Spatial and Temporal Scales in Restoration. Gordon H. Reeves U.S. Forest Service PNW Research Station Corvallis, OR
Considerations of Spatial and Temporal Scales in Restoration Gordon H. Reeves U.S. Forest Service PNW Research Station Corvallis, OR The climate/habitat ratchet: cumulative impacts tell the story (Anderson
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus
EFB 496.10/696.03 Wetland Restoration Techniques Online Class Syllabus SUNY-ESF College of Environmental Science and Forestry Summer Session II 2015 Wetland Restoration Techniques is a graduate and undergraduate
Water Quality Restoration Plan. West Fork Illinois River Watershed HUC 1710031104
Water Quality Restoration Plan West Fork Illinois River Watershed HUC 1710031104 Prepared by: Medford District Bureau of Land Management, Grants Pass Resource Area February 2007 1 Table of Contents Element
Clean Water from Urban Forests. Urban Riparian Buffer Program
Clean Water from Urban Forests Urban Riparian Buffer Program TDF Urban Riparian Buffer Program A Clean Water from Urban Forests Initiative TDF Urban Riparian Buffer Program A Clean Water from Urban Forests
Protecting Floodplain. While Reducing Flood Losses
Protecting Floodplain Natural and Beneficial i Functions While Reducing Flood Losses Jon Kusler Association of State Wetland Managers 518 872 1804; jon.kusler@aswm.org Report available at: http://aswm.org/pdf_lib/nbf.pdf
Hawlings River Watershed Restoration Action Plan December 2003
Hawlings River Watershed Restoration Action Plan December 2003 MONTGOMERY COUNTY DEPARTMENT OF ENVIRONMENTAL PROTECTION Montgomery County s Water Quality Goals Montgomery County has a rich and diverse
3. The submittal shall include a proposed scope of work to confirm the provided project description;
QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding
SEC. 4001. PURPOSE. SEC. 4002. DEFINITIONS. SEC. 4003. COLLABORATIVE FOREST LANDSCAPE RESTORATION PROGRAM.
TITLE IV--FOREST LANDSCAPE RESTORATION SEC. 4001. PURPOSE. The purpose of this title is to encourage the collaborative, sciencebased ecosystem restoration of priority forest landscapes through a process
Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016
Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 James L. McIntire Washington State Treasurer Summary The State of Washington offered green bonds to investors in September 2015, with approximately
EROSION. Prepared by. Integrated. August 2014 COMMON GROUND. www.ierstahoe.com
SKY BASIN (UPPER CA 1 WATERSHED) EROSION ASSESSMENT Prepared by Kevin Drake, CPESC Integrated Environmental Restoration Services, Inc. August 2014 COMMON GROUND UNCOMMON SOLUTIONS P.O. BOX 7559 2780 LAKE
Integrating Landscape Restoration and CWPP
Integrating Landscape Restoration and CWPP Two approaches: One or more CWPP embedded in a larger landscape to achieve multiple objectives CWPP that encompasses a larger landscape to achieve multiple objectives
Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE
Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Introductions Brett Long, PE Project Permitting & Construction Oversight Chris Streb, PE Project Designer & Construction Oversight Assistance WHO WE ARE
USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions 2013-09-05 Table of Contents
USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions 2013-09-05 Table of Contents What is the Final Rule implemented by the Forest Service?... 2 Why
Multi-purpose Drainage Management (MDM) Plans
Multi-purpose Drainage Management (MDM) Plans August 13, 2015 Chuck Brandel, PE Civil Engineer, ISG Joe Mutschler, PE Faribault County SWCD AGENDA 1. Multi-purpose Drainage Management (MDM) Plans 2. Examples
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
The project site lies within an AE Zone and portions lie within the regulated floodway. Development of this site is subject to TCLUO, Section 3.060.
Introduction This application is for the Southern Flow Corridor-Landowner Preferred Alternative, a flood mitigation and tidal wetland restoration project. The Port of Tillamook Bay is the applicant in
Floodplain Connectivity in Restoration Design
Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,
Increasing water availability through juniper control.
Tim Deboodt, OSU Crook County Extension Agent 498 SE Lynn Blvd. Prineville, OR 97754 541-447-6228 Tim.deboodt@oregonstate.edu Increasing water availability through juniper control. Throughout the region
HCP Team Meeting. November 18, 2015. icfi.com
HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next
Restoring and Managing Riparian Areas
Restoring and Managing Riparian Areas Presentation to the Forest Watershed Management Symposium 12 March 2015 Susanville, CA Themes from the Science Synthesis for the Sierra Nevadasouthern Cascade Range
Wildfire & Flash Flood Recovery Emergency Watershed Protection (EWP) Flood Mitigation Efforts April 2014. Fall 2013
Wildfire & Flash Flood Recovery Emergency Watershed Protection (EWP) Flood Mitigation Efforts April 2014 Fall 2013 Recovery Specific to Incident Recovery Efforts Depend on: Population Impacted Topography
Untreated (left) and treated (right) Sierra Nevada forests in Amador County, CA. Photos: Sierra Nevada Conservancy
Case Study Mokelumne Watershed, CA and Santa Fe, NM Avoided Costs: The Economics of Watershed Restoration Forested headwaters are the source of much of the West s drinking water. Protecting and restoring
Upper South Fork Salmon River Resource Management Project Proposed Action February 9, 2011
Upper South Fork Salmon River Resource Management Project Proposed Action February 9, 2011 Project Area Description The Upper South Fork Salmon River (SFSR) Resource Management Project is located in the
Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute
Healthy Forests Resilient Water Supply Vibrant Economy Ecological Restoration Institute How Water Gets to Your Home MOST OF THE VALLEY S WATER SUPPLY comes from winter precipitation and runoff from Arizona
Backyard Buffers. Protecting Habitat and Water Quality
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
RESTORING streams to reduce flood loss
RESTORING streams to reduce flood loss Flood Loss Reduction the Natural Way Flood disasters have become a regular Floods can devastate local occurrence. One in your community may have communities. threatened
Experience Summary. KINA MURPHY, M.S. Ecologist / Community Planner 9 Stone Ridge Road, Santa Fe, NM 87505 Cell: 505-603- 7188. Education / Training
Ecologist / Community Planner 9 Stone Ridge Road, Santa Fe, NM 87505 Cell: 505-603- 7188 Education / Training Universities/Colleges Ph.D Candidate, Biology/ Ecology, University of New Mexico, Collins Lab,
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management Stream Restoration Cost Estimates BRIAN BAIR USDA Forest Service Gifford-Pinchot National Forest 1262 Hemlock
Addendum D. Nomination of Moody Wash ACEC
Addendum D Nomination of Moody Wash ACEC Moody Wash ACEC is hereby nominated by Citizens for Dixie s Future to: BLM St. George Field Office 345 East Riverside Drive St. George, UT 84790 Moody Wash is a
Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
2014 Feather River Post-Fire Restoration Reforestation
Introduction and Location Feather River Post-Fire Restoration Reforestation Project USDA Forest Service Boise National Forest Mountain Home Ranger District Elmore County, Idaho The Mountain Home Ranger
NEW JERSEY HIGHLANDS COALITION 508 Main Street, Boonton, New Jersey 07005 973-588-7190 (office)/973-588-7193 (fax)
NEW JERSEY HIGHLANDS COALITION 508 Main Street, Boonton, New Jersey 07005 973-588-7190 (office)/973-588-7193 (fax) www.njhighlandscoalition.org Forest Stewardship Position Paper of the Natural Heritage
American Forest Foundation (AFF) 2010-2015 Standards of Sustainability for Forest Certification
American Forest Foundation (AFF) 2010-2015 Standards of Sustainability for Forest Certification Standards Prologue The American Forest Foundation s (AFF) 2010-2015 Standards of Sustainability for Forest
GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act
Cape Cod Cranberry Growers Association GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act Cranberry Bogs and the Agricultural Exemption The Massachusetts Wetlands Protection Act (WPA)
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management Stream Habitat Restoration Cost Considerations MARK COCKE, Civil Engineer Natural Resources Conservation
Updates: LUR Rulemaking & FEMA Flood Mapping. Vince Mazzei, PE
Updates: LUR Rulemaking & FEMA Flood Mapping Vince Mazzei, PE New Jersey Department of Environmental Protection Division of Land Use Regulation February 11, 2015 Today s topics: Brief overview of NJ s
Sims Bayou Federal Flood Damage Reduction Project
Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD
Plumas Watershed Forum. Review of Ongoing Projects. Updated 10/1/008
Plumas Watershed Forum Review of Ongoing Projects Updated 10/1/008 Hosselkus II Restoration Project Approved Funding: $80,000 (A funds) Expended By 10/1/08: $79,603 This pond-and-plug creek restoration
Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural
Nuts and bolts of BAER soil and watershed assessments
27 Nuts and bolts of BAER soil and watershed assessments MARSHA DAVIS, National Park Service Columbia Cascades Support Office, 909 First Avenue, Seattle, Washington 98104; marsha_davis@nps.gov CHRIS HOLBECK,
Using Aerial Photography to Measure Habitat Changes. Method
Then and Now Using Aerial Photography to Measure Habitat Changes Method Subject Areas: environmental education, science, social studies Conceptual Framework Topic References: HIIIB, HIIIB1, HIIIB2, HIIIB3,
SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM
SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental
13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT
13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT A. Existing Conditions Ramsey is fortunate to have an ample amount of natural resources and open space areas and a community attitude that is increasingly
Oregon. Climate Change Adaptation Framework
Oregon Climate Change Adaptation Framework Oregon Environmental Quality Commission Climate Change Adaptation Framework Presentation at a glance: Purposes of the framework Participating agencies Climate
Stormwater Wetland Design and Construction Mitigation Duke Bitsko. Construction Activities, Schedule and Sequence Tom Ritchie
September 7, 2011 Welcome Catherine Daly Woodbury DCR Coordination Dan Driscoll Project Background Catherine Daly Woodbury Stormwater Wetland Design and Construction Mitigation Duke Bitsko Construction
The Eight Tools of Watershed Protection. Tom Schueler Center for Watershed Protection EPA Webcast
The Eight Tools of Watershed Protection Tom Schueler Center for Watershed Protection EPA Webcast 1 About the Center for Watershed Protection Non-profit 501(c)3, non-advocacy organization Work with watershed