The Total Economic Impact Of Oracle Enterprise Manager Configuration Management Pack, And Provisioning And Patch Automation Pack

Size: px
Start display at page:

Download "The Total Economic Impact Of Oracle Enterprise Manager Configuration Management Pack, And Provisioning And Patch Automation Pack"

Transcription

1 Prepared fr Oracle Crpratin March, 2009 The Ttal Ecnmic Impact Of Oracle Enterprise Manager Cnfiguratin Management Pack, And Prvisining And Patch Autmatin Pack Multicustmer Analysis Prject Directr: Michael Speyer, Frrester Cnsulting

2 Table Of Cntents Executive Summary...3 Purpse...3 Methdlgy...3 Apprach...4 Abut Oracle Enterprise Manager...4 Key Findings...5 Disclsures...6 Organizatin Interview Highlights...7 Cmmn Objectives And Challenges Slved By Oracle Enterprise Manager...7 Sample Organizatin...9 Descriptin Of The Sample Organizatin...9 Csts, Benefits, And Risk...11 Csts...11 Cst Details...11 Benefits And Savings...12 Benefits And Savings Details...12 Risk...14 Financial Analysis...15 Findings and Cnclusins...16 Appendix A: Ttal Ecnmic Impact Primer...18 Appendix B: Risk-Adjustment Factrs , Frrester Research, Inc. All rights reserved. Unauthrized reprductin is strictly prhibited. Infrmatin is based n best available resurces. Opinins reflect judgment at the time and are subject t change. Frrester, Techngraphics, Frrester Wave, RleView, TechRadar, and Ttal Ecnmic Impact are trademarks f Frrester Research, Inc. All ther trademarks are the prperty f their respective cmpanies. Fr additinal infrmatin, g t

3 Executive Summary In March 2009, Frrester Cnsulting initiated wrk n a research prject cmmissined by Oracle Crpratin that fcused n examining the ptential return n investment (ROI) that enterprises may realize by adpting Oracle Enterprise Manager. This study specifically examines the benefits f Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and (cllectively referred t as Packs ) fr managing databases, middleware, and applicatins, as well as hardware and perating systems. This study highlights the benefits and csts f deplying these Packs acrss the enterprise f a sample Organizatin (see descriptin f sample Organizatin starting n page 9. The findings in this study are, in a large part, based n in-depth interviews cnducted with six rganizatins currently using the Packs. The study examines the estimated ROI fr the sample Organizatin and presents the aggregate findings derived frm the interviews and analysis prcess as well as Frrester s independent research. The study fund that fr the sample Organizatin, the Packs prvided benefits and savings in the fllwing areas: Reductin in nging csts f managing IT cnfiguratins, cmpliance, patching, and prvisining. Increased administratr and IT peratins staff prductivity thrugh standardizatin f glden cnfiguratin standards, and by replacing errr-prne manual tasks with autmatin. Increased respnse t business needs and ability t scale envirnment thrugh autmated mass deplyment. A 20% reductin (ver three years) in capital spending n servers mnitred by Oracle Enterprise Manager. This sample Organizatin achieved a risk-adjusted and a very favrable 124% ROI (130% nnrisk-adjusted ROI) ver a three-year perid with a risk-adjusted payback perid f 15 mnths (14 mnths nn-risk-adjusted). Purpse The purpse f this study is t prvide readers with a framewrk t evaluate the ptential financial impact f Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and. Frrester s aim is t clearly shw all calculatins and assumptins that g int the analysis. This study shuld be seen as a guide t better understand and evaluate Oracle Enterprise Manager Cnfiguratin Management Pack and Prvisining and. Methdlgy Oracle selected Frrester fr this prject because f ur expertise in enterprise IT management technlgies and Frrester s Ttal Ecnmic Impact (TEI) analysis methdlgy. TEI nt nly measures csts and benefits (areas that are typically accunted fr within IT); it als weighs the enabling value f a technlgy in increasing the effectiveness f verall business prcesses. Frrester emplyed three fundamental elements f TEI (see Appendix A) in this study: - 3 -

4 Cst and cst reductin. Benefits and savings t the entire rganizatin. Risk. Given the increasing sphisticatin that enterprises have regarding cst analyses related t IT investments, the TEI methdlgy serves an extremely useful purpse by prviding a cmplete picture f the ttal ecnmic impact f purchase decisins. Apprach Frrester used a fur-step apprach fr this study: 1. Frrester interviewed Oracle marketing and prduct management emplyees t fully understand the value prpsitin f Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and. 2. Using knwledge f Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and, as well as input frm existing Frrester research and Oracle, a Frrester representative cnducted in-depth discussins with six f Oracle s custmers regarding their experiences with Oracle slutins. 3. Frrester cnstructed a financial value mdel representative f the data cllected in the interviews. 4. Frrester created this study, which represents and examines the estimated value f the findings derived frm the custmer interview and analysis prcess and frm Frrester s independent research. Abut Oracle Enterprise Manager Oracle Enterprise Manager is Oracle s slutin fr managing IT applicatins running n Oracle s enterprise applicatin stack, which spans Oracle packaged applicatins, Oracle Fusin Middleware, Oracle Database, Oracle Enterprise Linux, and Oracle VM. Oracle Enterprise Manager emplys a tp-dwn apprach t applicatin management, enabling custmers t reduce IT csts while increasing the quality f services delivered with its enterprise applicatins. Oracle Enterprise Manager prvides the fllwing capabilities: Applicatin perfrmance management. Prvides a brad range f capabilities including user experience mnitring; mdel-based mnitring fr all middleware cmpnents, database mnitring cmbined with crss-tier diagnstics, and autmated remediatin f perfrmance issues. Cnfiguratin management, prvisining, and patching. Prvides capabilities including autmatic IT asset discvery, real-time change detectin, risk mitigatin fr IT cnfiguratins, and IT cmpliance autmatin, in additin t autmated prvisining f systems and patches fr Oracle and nn-oracle technlgies. Applicatin quality management. Prvides a set f slutins fr testing applicatins including accelerated testing slutins fr Oracle packaged applicatins; Web-based and - 4 -

5 SOA applicatin testing; Oracle Database testing slutins, using real prductin wrklads, and secure data sharing; Fr mre infrmatin n Oracle Enterprise Manager, visit racle.cm/enterprisemanager. Key Findings Frrester s interviews and research shw that the Packs prvide significant value t rganizatins. There were several cmmn benefits cited by the six interviewed rganizatins that are described briefly belw, and in mre detail in the Benefits And Savings sectin f this study (page 12). Frm these cmmn value statements, Frrester was able t generate a ptential ROI fr a sample Organizatin. The bjective was t illustrate hw the cmmn benefit and cst estimates can be applied t ther rganizatins cnsidering the purchase f Oracle Enterprise Manager. As stated abve, fr ur sample Organizatin, the Packs prvided benefits and savings in the fllwing areas: Reductin in nging csts f managing IT cnfiguratins, cmpliance, patching, and prvisining. Increased administratr and IT peratins staff prductivity thrugh standardizatin f glden cnfiguratin standards, and by replacing errr-prne manual tasks with autmatin. Increased respnse t business needs and ability t scale envirnment thrugh autmated mass deplyment. A 20% reductin (ver three years) in capital spending n servers mnitred by Oracle Enterprise Manager. This sample Organizatin is using the Packs and achieved a very favrable 124% ROI (riskadjusted) ver a three-year perid with a payback perid f 15 mnths. On a nn-risk-adjusted basis, the sample Organizatin achieved a system 130% ROI ver a three-year perid with a payback perid f 14 mnths. Table 1 shws a three-year summary f the ROI, payback perid, net present value (NPV), csts, and risk-adjusted benefits fr ur sample Organizatin. Table 1: Three-Year Summary Financial Results Sample Organizatin (Risk-Adjusted) Summary financial results Original estimate Risk-adjusted ROI 130% 124% Payback perid (mnths) Ttal csts (PV) ($1,784,832) ($1,784,832) Ttal benefits (PV) $4,106,273 $3,991,180 Ttal (NPV) $2,321,442 $2,206,349 * Frrester used a discunt rate f 10% t calculate PV and NPV. Surce: Frrester Research, Inc

6 The three-year ttal risk-adjusted net present value (NPV) f $2,206,349 represents the incremental net cst savings and benefits attributed t successfully implementing and using the Packs. Prir t implementatin, the sample Organizatin was experiencing and trying t remedy the fllwing histrical issues: Inability t track and maintain system cnfiguratins. Difficulty in fllwing mandated security and cmpliance standards. System errrs and dwntime as a result f applying incrrect sftware patches and updates. Inability t perfrm rt-cause analysis n system failures. Inefficient use f administratr resurces when executing planned and unplanned system management events. Cst and benefits details are prvided belw in the Csts, Benefits, And Risk sectin (page 11). A risk-adjusted ROI that demnstrates a cmpelling business case raises cnfidence that the investment is likely t succeed because the risks that threaten the prject have been taken int cnsideratin and quantified. The risk-adjusted numbers, because they represent the expected value cnsidering risk, shuld thus be taken as realistic expectatins. Assuming nrmal success at mitigating risk, the risk-adjusted numbers shuld mre clsely reflect the expected utcme f the investment. The bjective f this study is t illustrate the savings and benefits that the sample Organizatin realized frm deplying the Packs. The results can guide ther rganizatins expectatins with respect t the savings and benefits that might be realized in their particular business envirnments. Disclsures The reader shuld be aware f the fllwing disclsures assciated with this study: The study was cmmissined by Oracle and delivered by the Frrester Cnsulting grup. Oracle reviewed and prvided feedback t Frrester, but Frrester maintained editrial cntrl ver the study, its findings, and the financial data. Frrester did nt accept any changes t the study that cntradicted its findings, bscured the meaning f the study, r changed any f the data cllected. The custmer names fr the interviews were prvided by Oracle. Frrester makes n assumptins as t the ptential ROI ther enterprises will receive within their wn envirnments. Frrester strngly advises that the reader use his r her wn estimates within the framewrk prvided in the study t determine the apprpriateness f implementing the Oracle slutin. This study is nt an endrsement by Frrester f Oracle r its fferings. The study is nt a cmpetitive prduct analysis

7 Organizatin Interview Highlights Frrester s cnclusins were derived in large part frm infrmatin received in a series f in-depth interviews with executives and persnnel at six rganizatins that were carefully selected t represent a brad range f industries, gegraphies, and size. These rganizatins are current users f the Packs. The fllwing is a brief descriptin f each f the interviewed rganizatins: 1. A Eurpean-based internatinal bank and financial services firm with mre than 500 billin in assets. The firm s dedicated Oracle department f 40 administratrs manages mre than 600 databases and has been using Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and fr 18 mnths. 2. An internatinal scientific research cnsrtium that has been using Oracle Enterprise Manager Cnfiguratin Management Pack fr tw years and Oracle Enterprise Manager Prvisining and fr fur years. Fifteen administratrs regularly use Oracle Enterprise Manager. 3. A Eurpean manufacturing firm with lcatins in 52 cuntries. The firm has been using Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and fr 12 mnths t manage 300 systems. 4. A mtr vehicle rental firm with extensive peratins in Eurpe and Nrth America. The firm has been using the Packs fr mre than three years t manage mre than 300 database and middleware systems. 5. An ecnmic and banking regulatry agency that has been using Oracle Enterprise Manager Prvisining and fr mre than a year t manage 170 databases and middleware systems. 6. A university-based, gvernment-funded research facility that has been using the Packs fr 18 mnths t help manage its hardware, perating systems, databases, and middleware that reside n 72 systems, as well as varius strage subsystems and lad-balancing appliances. Cmmn Objectives And Challenges Slved By Oracle Enterprise Manager The custmers Frrester interviewed had several cmmn high-level business bjectives, as well as tactical prblems r issues that they were hping t address and slve by investing in Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and. These bjectives and challenges are shared by this study s sample Organizatin (see sample Organizatin descriptin belw, n page 9). Cmmn high-level business bjectives r strategies included: Reduce the nging csts f managing IT cnfiguratins, cmpliance, patching, and prvisining. Imprve administratr prductivity t keep pace with business grwth by replacing errrprne manual tasks with autmatin. Establish baseline r gld cnfiguratins in rder t reduce cnfiguratin drift, simplify systems management, and reduce unplanned utages

8 Free up administratrs time t perfrm mre value-added advisry and strategic services (beynd installing, tuning, patching, and upgrading databases). These value-added services include: addressing security issues and capacity planning. Adhere t security and cmpliance standards and quickly prduce apprpriate audit reprts. Implement prcesses t reduce errrs in and the effrt required t apply critical and nncritical sftware patches. Have a centralized platfrm t practively mnitr alerts fr databases/systems and servers/clusters 24x7 s prblems can be reslved quickly. Ensure high availability f missin-critical applicatins t internal and external users. Reduce capital spending in the area f servers and assciated maintenance. Cmmn tactical prblems r issues included: Crrecting a gvernance issue with t many custm scripts being created by all the administratrs. The rganizatins wanted t standardize practices and reduce the pssibility f human errr in these scripts. Cnducting IT asset tracking and discvery f majr cmpnents such as perating systems, hardware, databases, middleware, and applicatins within their envirnments. Managing unplanned dwntime due t unauthrized cnfiguratin changes in their critical business applicatins, which affected business end user prductivity. Preparing fr regulatry and cmpliance audits using time-cnsuming manual scripts, prcesses, and spreadsheets t track cnfiguratin changes and critical patch levels. Current manual prcesses remve key IT staff frm day-t-day peratinal tasks and business-critical prjects. Difficulty maintaining a system fr managing gld standards fr deplying new servers and sftware. Dealing with unpredictable demands frm the business fr rlling ut new services while maintaining and ensuring cmpliance t crprate gvernance practices and standards. T many human errrs in the sftware patching prcess, which resulted in cnfiguratin incnsistencies and system dwntime. Reduce the time and effrt needed t prvisin new systems in rder t meet end user service-level agreements

9 Sample Organizatin Frrester examined the csts and benefits f Oracle Enterprise Manager by cnducting in-depth interviews with six Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and custmers. The resulting data, alng with Frrester s independent research, generated a baseline t determine the ptential ROI fr rganizatins cntemplating their wn deplyment f these slutins. Frrester s sample Organizatin belw has similar csts, benefits, gals, and bjectives as the six cmpanies that were interviewed. The purpse f the sample Organizatin is t shw the ptential ROI. Descriptin Of The Sample Organizatin With revenue f just ver $2 billin, this glbal enterprise has 150 prductin databases and 25 missin-critical business applicatins running its supply chain, CRM system, finance, HR, and partner exchange prtal. The rganizatin als has an ecmmerce Web site that allws custmers t rder and track nline purchases. The enterprise has mre than 200 CPUs with ne majr data center, three reginal data centers, and mre than 40 wrldwide branch ffices. This rganizatin participates in bth the cmmercial and cnsumer markets selling a brad range f durable gds and services. Prir t implementing Oracle Enterprise Manager, the Organizatin was experiencing a rapid rate f business change and slwing IT respnse t business requirements. Management cnsidered its IT peratinal csts t high, while its IT budget remained relatively flat year-ver-year. The rganizatin experienced difficulty achieving service levels due t unauthrized system changes, cnfiguratin incnsistencies, and discrepancies in systemwide patching. The cmpany s ability t cmmissin new systems in respnse t business needs fr new IT services and prcesses suffered, creating bstacles fr the cmpany s grwth. The Organizatin s specific challenges were: Decreasing the peratinal verhead and time needed t manage their IT envirnment and prvisining f new services. Business grwth demanded rapid deplyment f new systems, and manual deplyment prcesses were t lengthy and cstly. Tracking and maintaining system cnfiguratins was a lengthy and errr-prne prcess. Cnfiguratin errrs were causing system dwntime, which affected the business. An inability t meet reprting deadlines fr security and cmpliance audits, which stemmed frm the manual prcesses used t track sftware patch applicatins and cnfiguratin changes. The IT rganizatin was facing increasing pressure t meet security and cmpliance standards. Difficulty in identifying which systems needed patching. The prcess f determining which systems needed patch updates tk t lng, and systems wuld change during the discvery prcess. This wuld result in incrrect patches being applied, which caused system dwntime. Inability t perfrm rt-cause analysis fr system failure, because it was t difficult t determine system cnfiguratins changes. Flat IT budgets required the cmpany t maximize hardware and sftware resurce utilizatin. Pr asset tracking capabilities were making it difficult t determine which assets the Organizatin wned and utilized. An verall IT gal t implement ITIL management prcesses

10 Critical success factrs and high-level business bjectives r strategies that the sample Organizatin hpes t achieve by implementing Oracle Enterprise Manager include: Reduce the frequency and recvery time fr unplanned utages that may result frm cnfiguratin errrs and incrrectly applied patches. Track system cnfiguratins and cnfiguratin drift with gal f achieving standardized cnfiguratin. Accurately maintain hardware and sftware inventries. Reduce database administratr labr effrt assciated with planned events like sftware patch updates and prvisining new systems. Enfrce and maintain security and cmpliance standards. Reduce human errrs in the patching and prvisining prcesses. The CIO fr this Organizatin is in charge f the adptin f IT technlgies that supprt business prcess autmatin a requirement frm the Organizatin s line-f-business managers. This has resulted in the increased adptin f packaged and custm-built applicatins that take advantage f mdern technlgies such as SOA, grid cmputing, and virtualizatin. Fr the sample Organizatin, it has becme increasingly critical t effectively manage such applicatins and its underlying infrastructure. The Organizatin chse Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and t help with the challenges assciated with maintain its perating systems, databases, middleware, and applicatins. The ultimate gal f this sample Organizatin is t ensure the health f business applicatins that drive revenue. An investment in Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and includes the fllwing csts (see the Csts, Benefits, And Risk sectin fr quantificatin f the csts): Internal planning fr the implementatin f Oracle Enterprise Manager. Tw servers t hst Oracle Enterprise Manager. Oracle Enterprise Manager Cnfiguratin Management Pack sftware licenses and Oracle Enterprise Manager Prvisining and licenses. Onging Oracle Sftware Update License and Supprt fr bth Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and Patch Autmatin Pack. Onging administratr time t maintain Oracle Enterprise Manager. Oracle Enterprise Manager training (Oracle Database 10g Administratin Wrkshp and Oracle Enterprise Manager Grid Cntrl 10g Wrkshp)

11 Csts, Benefits, And Risk Csts Csts and cst reductin are imprtant parts f the TEI mdel. Csts are calculated as a change in csts primarily t IT as a result f the intrductin f the technlgy t the Organizatin. Therefre, the intrductin f Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and affects IT budgets bth negatively (with the implementatin and purchase f the slutin) and psitively (in terms f cst savings and efficiencies created bth in IT and in the business). The sample Organizatin incurred csts in the fllwing categries: ne-time csts related t internal planning f Oracle Enterprise Manager implementatin; tw servers and sftware license csts assciated with Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and ; annual sftware supprt and maintenance csts; and Oracle training csts. These csts ttaled $1,918,250 ver the three years f this study. Fully burdened csts fr servers, training, planning, and maintenance are used. Cst Details Planning (time/effrt) t implement Oracle Enterprise Manager: $31, hurs at $130,000 annual cst per full-time equivalent (FTE). Tw servers t hst Oracle Enterprise Manager: $39,000 initial hardware csts, plus $3,000 in annual supprt csts. License cst fr Oracle Enterprise Manager Prvisining and : $525,000 $2,625 per each f the 200 CPUs Supprt csts: $346,500 ($115,500 annually) 22% f license csts, r $ per CPU. License cst fr Oracle Enterprise Manager Cnfiguratin Management Pack: $525,000 $2,625 per each f the 200 CPUs. Supprt csts: $346,500 ($115,500 annually) 22% f license csts, r $ per CPU. Training csts: $27,000 $3,000 each fr fur administratrs t attend Oracle Database 10g Administratin Wrkshp, and $3,750 t attend Oracle Enterprise Manager 10g Grid Cntrl Wrkshp. Administratr effrt t maintain Oracle Enterprise Manager: $78,800 20% f ne administratr s time annually at $130,000 annual cst per full-time equivalent (FTE). The financial results in this study assume that the sample Organizatin purchased and deplyed the Oracle Enterprise Manager Cnfiguratin Management Pack, and Oracle Enterprise Manager Prvisining and at a nrmal discunt frm Oracle as f March Other rganizatins may incur different prices; therefre, they shuld cntact their Oracle sales representative r the Oracle Stre Frrester makes n assumptin that ther rganizatins will achieve similar results as thse cited in the study

12 Table 2: Incremental Csts Assciated With Implementing Oracle Enterprise Manager Cnfiguratin Management Pack And Oracle Enterprise Manager Prvisining And Patch Autmatin Pack (Risk-Adjusted) Prjected csts Initial Year 1 Year 2 Year 3 Ttal Cst t implement and deply Oracle Enterprise Manager Annual administratr labr t maintain Oracle Enterprise Manager License and supprt csts fr Oracle Enterprise Manager Prvisining and Patch Autmatin Pack License and supprt csts fr Oracle Enterprise Manager Cnfiguratin Management Pack Tw servers t hst Oracle Enterprise Manager Administratr training expense Ttal Surce: Frrester Research, Inc. Present value ($31,250) ($31,250) ($31,250) ($26,000) ($26,000) ($26,000) ($78,000) ($64,658) ($525,000) ($115,500) ($115,500) ($115,500) ($871,500) ($812,231) ($525,000) ($115,500) ($115,500) ($115,500) ($871,500) ($812,231) ($30,000) ($3,000) ($3,000) ($3,000) ($39,000) ($37,461) ($27,000) ($27,000) ($27,000) ($1,138,250) ($260,000) ($260,000) ($260,000) ($1,918,250) ($1,784,832) Benefits And Savings The implementatin f Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and was the catalyst that helped the sample Organizatin achieve benefits in the fllwing areas: administratr prductivity savings, business prductivity (aviding dwntime, increased availability), and capital expenditure savings (servers). These benefits are described and quantified belw and ttal $4,916,781 (risk-adjusted) ver the three years f this study. There are three adjustments that Frrester made t the benefit numbers t arrive at the riskadjusted numbers. These adjustments are related t: the learning curve f Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and Patch Autmatin Pack; the variatin in the amunt f benefits that a cmpany may experience; and variatin in the number f benefits that a cmpany may experience. These adjustments are described in the Risk sectin. Benefits And Savings Details Administratr Prductivity Savings The Organizatin was able t imprve administratr prductivity by a ttal f 63% in the first year, by 100% in the secnd year, and by 125 % in the third year as a result f prductivity imprvements achieved using Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and. The Organizatin achieved a risk-adjusted $1,498,725 in administratr labr savings (ver a three-year perid) frm using the Packs based n labr saved in the fllwing tasks: Oracle Enterprise Manager Prvisining and : Planned patch events (e.g., patchset r majr patches) fr any OS, database, middleware, r applicatin

13 Unplanned patch events (e.g., critical r minr patches) fr any OS, database, middleware, r applicatin. Single-instance database prvisining. Real Applicatin Cluster (RAC) prvisining. Bare Metal Linux prvisining. Oracle Enterprise Manager Cnfiguratin Management Pack: Track current system inventry and/r discver new hardware r sftware. Cmpare systems against baseline cnfiguratins r gld images t check fr cnfiguratin drift. Mnitr systems fr changes in cnfiguratin r t check cnfiguratin histry. Search fr hardware/sftware assets r specific settings acrss yur data center. Mnitr systems fr cmpliance against plicies r standards. Business Prductivity Savings (Aviding Dwntime, Increased Availability) The Organizatin achieved a risk-adjusted $2,555,556 in benefits (ver a three-year perid) frm a reductin in system dwntime and a crrespnding increase in availability frm the use f Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and based n the fllwing capabilities: Oracle Enterprise Manager Prvisining and : Dwntime reductin due t autmated patching f sftware. Dwntime avidance by extending capacity t mitigate nde failure. Oracle Enterprise Manager Cnfiguratin Management Pack: Reductin in time needed t make repairs (MTTR) based n identifying f ut-f-band cnfiguratin changes causing dwntime. Dwntime reductin due t autmated plicy vilatin detectin and mitigatin. Capital Expenditure Savings (Servers) The Organizatin achieved a risk-adjusted $862,500 in benefits (ver a three-year perid) frm capital spending avidance n servers frm the use f Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and based n the fllwing capabilities: Oracle Enterprise Manager Prvisining and :

14 Servers nt purchased thrugh cnslidatin with prvisining autmatin. Oracle Enterprise Manager Cnfiguratin Management Pack: Servers nt purchased thrugh identificatin, utilizatin, and management f all knwn servers. Table 3: Benefits And Savings Assciated With Implementing Oracle Enterprise Manager Cnfiguratin Management Pack And Oracle Enterprise Manager Prvisining And Patch Autmatin Pack (Risk-Adjusted) Prjected benefit (risk-adjusted) Initial Year 1 Year 2 Year 3 Ttal PV Administratr prductivity savings frm Oracle Enterprise Manager Prvisining and $0 $14,402 $23,043 $28,803 $66,247 $53,776 Administratr prductivity savings frm cnfiguratin management pack $0 $311,408 $498,253 $622,816 $1,432,478 $1,162,809 Business prductivity savings frm Oracle Enterprise Manager Prvisining and Patch $0 $388,889 $622,222 $777,778 $1,788,889 $1,452,125 Autmatin Pack Business prductivity savings frm Oracle Enterprise Manager Cnfiguratin $0 $166,667 $266,667 $333,333 $766,667 $622,339 Management Pack Capital expenditure savings frm Oracle Enterprise Manager Prvisining and Patch $0 $37,500 $60,000 $75,000 $172,500 $140,026 Autmatin Pack Capital expenditure prductivity savings frm Oracle Enterprise Manager $0 $150,000 $240,000 $300,000 $690,000 $560,105 Cnfiguratin Management Pack Ttal benefits $0 $1,068,865 $1,710,185 $2,137,731 $4,916,781 $3,991,180 Surce: Frrester Research, Inc. Risk Risk-adjusted ROI is discussed in this study, and the sample Organizatin s benefits are quted in risk-adjusted (wrst-case) terms. Csts are nt risk-adjusted in this study because 95% f the csts are related Oracle firm-quted prducts and server hardware. The assessment f risk prvides a range f pssible utcmes based n the risks assciated with IT prjects in general and specific risks relative t rganizatins implementing Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and Patch Autmatin Pack. Frrester s research discvered that implementing Oracle Enterprise Manager was a relatively lw-risk endeavr. Since the future cannt be accurately predicted, there is risk inherent in any prject. Measurement f risk is a methd f incrprating the levels f cnfidence and uncertainty regarding the benefit estimates f a given investment. Higher cnfidence that the benefit estimates will be met implies that the level f risk is lwer, and the variatin between the risk-adjusted and nn-risk-adjusted utcmes is minimized. The fllwing risks were cnsidered in this reprt: 1. The learning curve factr. The rganizatins Frrester interviewed cited a fairly significant learning curve in benefits realizatin, hence Frrester assumes that in Year 1, the sample Organizatin achieves

15 50% f the ptimum level f benefits; in Year 2, it increases t 80%; and in Year 3, Frrester assumes (and interviewed rganizatins reprted) a full 100% achievement f the benefits. 2. Variatin in the value f realized benefits. The rganizatins Frrester interviewed reprted significant variatins in the value f the benefits realized fr the management tasks used t evaluate ROI. Based n reprted data, Frrester develped high, lw, and mst likely values fr each benefit. The riskadjusted value is the mean f the distributin f thse pints. Fr the administratr prductivity benefits, the mst likely average task time savings is 1.5 hurs. Fr dwntime reductin, the mst likely average dwntime time saving is 0.63 hurs per event. Refer t Appendix B fr a detailed accunting f the variance in time savings realized. 3. Variatin in the number f realized benefits. The rganizatins Frrester interviewed did nt all realize the same benefits because they did nt all use the same features r functins ffered by the Packs. Fr example, if Cmpany A did nt use the single database prvisining feature, it culd nt derive a benefit assciated with this. T accunt fr the variatin in the number f realized benefits fr the sample Organizatin, Frrester determined the percent f interviewed rganizatins that realized each benefit and adjusted the value f the benefit by this amunt, i.e., if nly 50% f cmpanies used a specific feature and realized the assciated benefit, then the value f benefit was adjusted by 50%. On average, the value f all benefits was adjusted by 63%. Refer t Appendix B fr a detailed accunting f this risk-adjustment factr. If a risk-adjusted ROI still demnstrates a cmpelling business case, it raises cnfidence that the investment is likely t succeed, since the risks that threaten the prject have been taken int cnsideratin and quantified. The risk-adjusted numbers shuld be taken as realistic expectatins, since they represent the expected value cnsidering risk. Assuming nrmal success at mitigating risk, the risk-adjusted numbers shuld mre clsely reflect the expected utcme f the investment. Financial Analysis Belw, Table 1 (repeated frm the Key Findings sectin) shws a three-year summary f the ROI, payback perid, net present value (NPV), csts, and risk-adjusted savings and benefits fr ur sample Organizatin. Table 1: Three-Year Summary Financial Results Sample Organizatin (Risk-Adjusted) Summary financial results Original estimate Risk-adjusted ROI 130% 124% Payback perid (mnths) Ttal csts (PV) ($1,784,832) ($1,784,832) Ttal benefits (PV) $4,106,273 $3,991,180 Ttal (NPV) $2,321,442 $2,206,349 * Frrester used a discunt rate f 12% t calculate PV and NPV. Surce: Frrester Research, Inc. The three-year risk-adjusted ttal net present value (NPV) f $2,206,349 represents the incremental net cst savings and benefits attributed t successfully implementing and using Oracle Enterprise

16 Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and Patch Autmatin Pack. Cst and benefits details are prvided in the Csts, Benefits, and Risk sectin. A risk-adjusted ROI that demnstrates a cmpelling business case raises cnfidence that the investment is likely t succeed because the risks that threaten the prject have been taken int cnsideratin and quantified. The risk-adjusted numbers, because they represent the expected value cnsidering risk, shuld thus be taken as realistic expectatins. Assuming nrmal success at mitigating risk, the risk-adjusted numbers shuld mre clsely reflect the expected utcme f the investment. The bjective f this study is t illustrate the savings and benefits the sample Organizatin realized frm deplying Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and, nt thse that ther rganizatins might btain by ding s. The results can nevertheless guide ther rganizatins expectatins with respect t the savings and benefits that might be realized in their particular business envirnments. Findings and Cnclusins This study is meant t prvide the reader with a framewrk fr examining the csts and benefits f deplying Oracle Enterprise Manager Cnfiguratin Management Pack and Oracle Enterprise Manager Prvisining and (the Packs). Based n ur in-depth discussins with six current Oracle custmers, Frrester was able t estimate csts, benefits, and risks fr a sample Organizatin. Our findings indicate that the Organizatin shuld achieve a three-year riskadjusted NPV f $2,206,349, a very favrable 124% ROI, and a payback perid f 15 mnths. As with the custmers interviewed fr this study, the implementatin f the Packs was the catalyst that helped the sample Organizatin achieve benefits in the fllwing areas: administratr prductivity savings, business prductivity (aviding dwntime, increased availability), and capital expenditure savings (servers). Organizatins that are likely t achieve these benefits have the fllwing characteristics: Organizatins with many OS, database, middleware, r applicatins being managed by many administratrs having varying skill and experience levels and using nnstandard practices. IT departments experiencing a direct linear relatinship between the grwth in systems and the grwth f administratr headcunt, and that are lking t achieve prductivity gains. Organizatins that have a decentralized administratin functin and that need a mre centralized platfrm t practively mnitr alerts fr systems. Small-t-medium-size rganizatins with a part-time administratr, and/r system administratrs perfrming administratr tasks that are lking fr a mre cst-effective and efficient way t manage their IT cnfiguratins. Businesses that rely n technlgy t generate revenues and prfits and that are striving t be mre cmpetitive in their industry. Fr ur sample Organizatin, the Packs carry a lw level f risk, a very psitive 124% riskadjusted ROI, and a payback perid f 15 mnths t recup the investment

17 Fr the sample Organizatin, the favrable risk-adjusted ROI and payback perid raises cnfidence that an investment in Oracle Enterprise Manager is likely t succeed, since the risks that may threaten the prject have already been taken int cnsideratin and quantified. It s imprtant t nte that the value f the benefits realized will vary with the number f features and capabilities f each management pack that are utilized. Frrester makes n assumptins regarding the effects f Oracle s slutins at ther rganizatins. This study examines the ptential impact attributable t the six rganizatins that participated in the examinatin and applies the cmmn csts and benefits t the representative sample Organizatin. The underlying bjective f this dcument is t prvide guidance t technlgy decisin-makers seeking t identify areas where value can ptentially be created by using Oracle Enterprise Manager

18 Appendix A: Ttal Ecnmic Impact Primer Ttal Ecnmic Impact is primarily a cmmn language tl that is designed t capture and prperly cmmunicate the value f IT initiatives in a cmmn business language. In s ding, TEI cnsiders fur elements f any initiative: Benefits. Csts (smetimes referred t as ttal cst f wnership, r TCO). Flexibility. Risk. Figure 1 shws the TEI methdlgy cnceptually. Benefits, flexibility, and csts are cnsidered, thrugh the filter f risk assessment, in determining an expected ROI fr any given initiative. Figure 1: The Ttal Ecnmic Impact Methdlgy Optins created Base fr future Valued financially Cmmunicated Business value Quantified and valued Measured utside f IT BU accuntability Flexibility Benefits R I S K Ttal Ecnmic Impact (TEI) Technlgy cst IT budget IT accuntability Csts (TCO) Uncertainty Impact f assumptins Mre accuracy Higher success Surce: Frrester Research, Inc. Benefits Benefits represent the value delivered t the business by the prpsed prject. Often, IT prject justificatin exercises fcus n cst (e.g., TCO) and cst reductins. Amng industry leaders, IT is deplyed as an ffensive weapn with value expectatins greater than simple cst reductin, especially when thse cst reductins tend t fcus within IT. TEI captures the value prpsitin f the prpsed prject by measuring the benefits against the incurred csts. All benefits captured by TEI must be traceable back t ne r mre critical success factrs (CSFs). These CSFs are directly linked t a higher-level business strategy. If a prpsed technlgy investment generates benefits that cannt be satisfactrily linked t a CSF, then it will nt be

19 included as a benefit fr the rganizatin in the mdel. In these cases, TEI requires that the benefit be discarded. Under TEI, benefits may nly accrue t the business units. Benefits derived thrugh cst reductins within IT accrue as negative TCO t the IT budget, thereby shwing a reduced TCO. (TCO is cnsidered by TEI t be a single-dimensin, cst-centric fcus n the IT budget.) The TEI prcess begins with a discvery f ptential benefit areas. A representative, wh has the ability t capture the benefit in questin frm the rganizatin under examinatin, must validate each benefit captured during discvery. In ther wrds, values cannt be arbitrarily assigned t a benefit if that persn is nt in a psitin t deliver that benefit shuld the prject be apprved. Additinally, prjects that are expected t deliver business value require sme effrt n the part f the business t realize that value. That effrt may be in the frm f training, rganizatinal change, r a mdificatin f existing business prcesses. Therefre, TEI requires dialg with the business leaders respnsible fr making the necessary changes in rder t capture the prpsed benefit during the justificatin phase. TEI captures this dialg in the frm f the names f the individuals, which validates the value calculatin f each benefit. Within TEI, each benefit entered has a specific capture date. Althugh the benefit may be captured ver time, TEI requires the specificatin f a date when mst f the benefit has been captured. TEI will then place the value delivered in the apprpriate time frame within the prject. Csts Csts represent the investment necessary t capture the value, r benefits, f the prpsed prject. IT r the business units may incur csts. These may be in the frm f fully burdened labr, subcntractrs, r materials. Additinally, csts cnsider all the investment and expenses necessary t deliver the value prpsed. Flexibility Flexibility, which is nt a subject f this study, represents investing in additinal capacity that can, fr sme future additinal investment, be turned int a business benefit fr instance, an investment in an enterprisewide upgrade f the desktp wrd prcessr applicatin where the primary driver may be standardizatin (t increase efficiency) and licensing (t decrease IT csts). Hwever, a cllabrative wrkgrup feature may translate int greater wrker prductivity when the rganizatin is ready t absrb the discipline necessary t capture that benefit. The cllabratin feature des nt prmise benefit during this phase f the prject and must be captured later, incrprating additinal investment, mst likely in the frm f training. Hwever, the existence f the ptin has a present value that can be estimated. The flexibility cmpnent f TEI captures that value. Risk Risks are used t widen the pssible utcmes f the prject. Since the future cannt be accurately predicted, there is risk inherent in any prject. TEI captures risk in the frm f risks-t-benefits and risks-t-csts. Risks-t-benefits cnsiders all pssible risks t each pssible benefit. Likewise, risks-t-csts cnsiders all pssible risks t each pssible cst. Then a range is chsen by applying best judgment fr each cst and benefit, based n the set f risks assigned t each cst and benefit. The

20 range is entered in the frm f a lw estimate, a mst-likely value, and a high estimate. Fr example, the risks t a cst may result in a range frm the expected value as the lw estimate t tw times the expected value as the high fr a particular cst (representing a ptential tw times cst verrun). TEI applies a prbability density functin knwn as triangular distributin t the values entered. The expected value the mean f the distributin is used as the risk-adjusted cst r benefit number. The risk-adjusted csts and benefits are then summed t yield a cmplete risk-adjusted summary and ROI. Typical prject risk factrs t cnsider include the fllwing: Vendrs. The risk that the vendr f a prduct r technlgy may need t be replaced at sme pint during the prject duratin. Prducts. The risk that a prduct will nt deliver the functinality expected. Architecture. The risk that the current prduct architecture will nt allw future infrastructure decisins and changes. Culture. The risk that an rganizatin will be unable t absrb the new technlgy r adapt t its implementatin. Delays. The impact n revenues f a prject delay r cancellatin. Size. The direct crrelatin f prject risk t the size f the prject, as measured by applicatin size r budget

21 Appendix B: Risk-Adjustment Factrs Table 4 prvides details regarding the variance in task time benefits and percent f benefit realized that were used t calculate the risk-adjusted benefits. Table 4: Benefit Categry Risk Adjustment Factrs Benefit categry Value f realized benefit (hurs) Lw Mst likely High Percent f benefit realized Planned patch events (e.g., patchset r majr patches) fr any OS, database, middleware, r applicatin % Unplanned patch events (e.g., critical r minr patches) fr any OS, database, middleware, r applicatin % Single-instance database prvisining % Real Applicatin Cluster (RAC) prvisining % Bare Metal Linux prvisining % Dwntime reductin due t autmated patching f sftware % Dwntime avidance by extending capacity t mitigate nde failure % Server (assets) saved thrugh cnslidatin with prvisining autmatin 50% Track current system inventry and/r discver new hardware r sftware % Cmpare systems against baseline cnfiguratins r gld images t check fr cnfiguratin drift % Mnitr systems fr changes in cnfiguratin r t check cnfiguratin histry % Search fr hardware/sftware assets r specific settings acrss yur data center % Mnitr systems fr cmpliance against plicies r standards % Reductin in time needed t make repairs (MTTR) based n identifying f ut-f-band cnfiguratin changes causing dwntime % Dwntime reductin due t autmated plicy vilatin detectin and mitigatin % Servers (assets) nt purchased thrugh identificatin, utilizatin, and management f all knwn servers 50% Surce: Frrester Research, Inc

The Total Economic Impact Of NetApp s Storage Solutions For Server Virtualization

The Total Economic Impact Of NetApp s Storage Solutions For Server Virtualization Prepared fr NetApp, Inc. May 12, 2009 The Ttal Ecnmic Impact Of NetApp s Strage Slutins Fr Server Virtualizatin Multicmpany Analysis Prject Directr: Bb Crmier, Frrester Cnsulting The Ttal Ecnmic Impact

More information

The Total Economic Impact Of The BMC Atrium Configuration Management Database (CMDB) Solution

The Total Economic Impact Of The BMC Atrium Configuration Management Database (CMDB) Solution Prepared fr BMC Sftware, Inc. December 27, 2006 The Ttal Ecnmic Impact Of The BMC Atrium Cnfiguratin Management Database (CMDB) Slutin Multi-Cmpany Analysis Prject Directr: Bb Crmier, Frrester Cnsulting

More information

Table of Contents. This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS SUMMARY.

Table of Contents. This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS SUMMARY. Table f Cntents Tp Pricing and Licensing Questins... 2 Why shuld custmers be excited abut Micrsft SQL Server 2012?... 2 What are the mst significant changes t the pricing and licensing fr SQL Server?...

More information

The Total Economic Impact Of IBM s Worklight Platform

The Total Economic Impact Of IBM s Worklight Platform A Frrester Ttal Ecnmic Impact Study Prepared Fr IBM The Ttal Ecnmic Impact Of IBM s Wrklight Platfrm Cst Savings In The Develpment And Maintenance Of Multiplatfrm Mbile Apps Prject Directr: Jan ten Sythff

More information

Research Report. Abstract: The Emerging Intersection Between Big Data and Security Analytics. November 2012

Research Report. Abstract: The Emerging Intersection Between Big Data and Security Analytics. November 2012 Research Reprt Abstract: The Emerging Intersectin Between Big Data and Security Analytics By Jn Oltsik, Senir Principal Analyst With Jennifer Gahm Nvember 2012 2012 by The Enterprise Strategy Grup, Inc.

More information

Licensing the Core Client Access License (CAL) Suite and Enterprise CAL Suite

Licensing the Core Client Access License (CAL) Suite and Enterprise CAL Suite Vlume Licensing brief Licensing the Cre Client Access License (CAL) Suite and Enterprise CAL Suite Table f Cntents This brief applies t all Micrsft Vlume Licensing prgrams. Summary... 1 What s New in This

More information

Systems Support - Extended

Systems Support - Extended 1 General Overview This is a Service Level Agreement ( SLA ) between and the Enterprise Windws Services t dcument: The technlgy services the Enterprise Windws Services prvides t the custmer. The targets

More information

A Forrester Total Economic Impact Study Prepared For Alfresco The Total Economic Impact Of Alfresco Enterprise Content Management Solution

A Forrester Total Economic Impact Study Prepared For Alfresco The Total Economic Impact Of Alfresco Enterprise Content Management Solution A Frrester Ttal Ecnmic Impact Study Prepared Fr Alfresc The Ttal Ecnmic Impact Of Alfresc Enterprise Cntent Management Slutin Prject Directr: Sebastian Selhrst December 2011 TABLE OF CONTENTS Executive

More information

The Importance Advanced Data Collection System Maintenance. Berry Drijsen Global Service Business Manager. knowledge to shape your future

The Importance Advanced Data Collection System Maintenance. Berry Drijsen Global Service Business Manager. knowledge to shape your future The Imprtance Advanced Data Cllectin System Maintenance Berry Drijsen Glbal Service Business Manager WHITE PAPER knwledge t shape yur future The Imprtance Advanced Data Cllectin System Maintenance Cntents

More information

Internal Audit Charter and operating standards

Internal Audit Charter and operating standards Internal Audit Charter and perating standards 2 1 verview This dcument sets ut the basis fr internal audit: (i) the Internal Audit charter, which establishes the framewrk fr Internal Audit; and (ii) hw

More information

Network Security Trends in the Era of Cloud and Mobile Computing

Network Security Trends in the Era of Cloud and Mobile Computing Research Reprt Abstract: Netwrk Security Trends in the Era f Clud and Mbile Cmputing By Jn Oltsik, Senir Principal Analyst and Bill Lundell, Senir Research Analyst With Jennifer Gahm, Senir Prject Manager

More information

This report provides Members with an update on of the financial performance of the Corporation s managed IS service contract with Agilisys Ltd.

This report provides Members with an update on of the financial performance of the Corporation s managed IS service contract with Agilisys Ltd. Cmmittee: Date(s): Infrmatin Systems Sub Cmmittee 11 th March 2015 Subject: Agilisys Managed Service Financial Reprt Reprt f: Chamberlain Summary Public Fr Infrmatin This reprt prvides Members with an

More information

2008 BA Insurance Systems Pty Ltd

2008 BA Insurance Systems Pty Ltd 2008 BA Insurance Systems Pty Ltd BAIS have been delivering insurance systems since 1993. Over the last 15 years, technlgy has mved at breakneck speed. BAIS has flurished in this here tday, gne tmrrw sftware

More information

Request for Resume (RFR) CATS II Master Contract. All Master Contract Provisions Apply

Request for Resume (RFR) CATS II Master Contract. All Master Contract Provisions Apply Sectin 1 General Infrmatin RFR Number: (Reference BPO Number) Functinal Area (Enter One Only) F50B3400026 7 Infrmatin System Security Labr Categry A single supprt resurce may be engaged fr a perid nt t

More information

Better Practice Guide Financial Considerations for Government use of Cloud Computing

Better Practice Guide Financial Considerations for Government use of Cloud Computing Better Practice Guide Financial Cnsideratins fr Gvernment use f Clud Cmputing Nvember 2011 Intrductin Many Australian Gvernment agencies are in the prcess f cnsidering the adptin f clud-based slutins.

More information

A Forrester Total Economic Impact Study Prepared For Microsoft Total Economic Impact Study Of Microsoft Dynamics AX 2012

A Forrester Total Economic Impact Study Prepared For Microsoft Total Economic Impact Study Of Microsoft Dynamics AX 2012 A Frrester Ttal Ecnmic Impact Study Prepared Fr Micrsft Ttal Ecnmic Impact Study Of Micrsft Dynamics AX 2012 Prject Directr: Jnathan Lipsitz Cntributrs: Jn Ericksn December 2013 TABLE OF CONTENTS Executive

More information

Version: Modified By: Date: Approved By: Date: 1.0 Michael Hawkins October 29, 2013 Dan Bowden November 2013

Version: Modified By: Date: Approved By: Date: 1.0 Michael Hawkins October 29, 2013 Dan Bowden November 2013 Versin: Mdified By: Date: Apprved By: Date: 1.0 Michael Hawkins Octber 29, 2013 Dan Bwden Nvember 2013 Rule 4-004J Payment Card Industry (PCI) Patch Management (prpsed) 01.1 Purpse The purpse f the Patch

More information

Systems Load Testing Appendix

Systems Load Testing Appendix Systems Lad Testing Appendix 1 Overview As usage f the Blackbard Academic Suite grws and its availability requirements increase, many custmers lk t understand the capability f its infrastructure. As part

More information

Standardization or Harmonization? You need Both

Standardization or Harmonization? You need Both Standardizatin r? Yu need Bth Albrecht Richen and Ansgar Steinhrst Recently the CFO f a majr cnsumer electrnics cmpany stated, We dn t need standardizatin f ur wrldwide prcesses, we need harmnizatin. Is

More information

A Forrester Total Economic Impact Study Prepared For TeamQuest The Total Economic Impact Of TeamQuest Performance Software

A Forrester Total Economic Impact Study Prepared For TeamQuest The Total Economic Impact Of TeamQuest Performance Software A Frrester Ttal Ecnmic Impact Study Prepared Fr TeamQuest The Ttal Ecnmic Impact Of TeamQuest Perfrmance Sftware Prject Directr: Bb Crmier, Vice President and Principal Cnsultant June 2011 Frrester Cnsulting

More information

Information Services Hosting Arrangements

Information Services Hosting Arrangements Infrmatin Services Hsting Arrangements Purpse The purpse f this service is t prvide secure, supprted, and reasnably accessible cmputing envirnments fr departments at DePaul that are in need f server-based

More information

A Forrester Total Economic Impact Study Prepared For Oracle The Total Economic Impact of Oracle Exadata and Oracle Exalogic

A Forrester Total Economic Impact Study Prepared For Oracle The Total Economic Impact of Oracle Exadata and Oracle Exalogic A Frrester Ttal Ecnmic Impact Study Prepared Fr Oracle The Prject Directr: Jnathan Lipsitz Cntributrs: Michael Speyer September 2013 TABLE OF CONTENTS Executive Summary... 2 Cmbined Benefits Of Oracle

More information

State of Wisconsin DET Dedicated Virtual Host Services Offering Definition

State of Wisconsin DET Dedicated Virtual Host Services Offering Definition State f Wiscnsin DET Dedicated Virtual Hst Services Offering Definitin Dcument Revisin Histry Date Versin Creatr Ntes 10/29/2010 1.0 Phil Staley Initial draft 11/3/2010 1.1 Phil Staley Ryan McKee Secnd

More information

CASSOWARY COAST REGIONAL COUNCIL POLICY ENTERPRISE RISK MANAGEMENT

CASSOWARY COAST REGIONAL COUNCIL POLICY ENTERPRISE RISK MANAGEMENT CASSOWARY COAST REGIONAL COUNCIL POLICY ENTERPRISE RISK MANAGEMENT Plicy Number: 2.20 1. Authrity Lcal Gvernment Act 2009 Lcal Gvernment Regulatin 2012 AS/NZS ISO 31000-2009 Risk Management Principles

More information

UC4 AUTOMATED VIRTUALIZATION Intelligent Service Automation for Physical and Virtual Environments

UC4 AUTOMATED VIRTUALIZATION Intelligent Service Automation for Physical and Virtual Environments Fr mre infrmatin abut UC4 prducts please visit www.uc4.cm. UC4 AUTOMATED VIRTUALIZATION Intelligent Service Autmatin fr Physical and Virtual Envirnments Intrductin This whitepaper describes hw the UC4

More information

A Forrester Total Economic Impact Study Prepared For Fuzzy Logix The Total Economic Impact Of Fuzzy Logix s DB Lytix

A Forrester Total Economic Impact Study Prepared For Fuzzy Logix The Total Economic Impact Of Fuzzy Logix s DB Lytix A Frrester Ttal Ecnmic Impact Study Prepared Fr Fuzzy Lgix Prject Directr: Dean Davisn Cntributr: Nrman Frbush Octber 2013 TABLE OF CONTENTS Executive Summary... 2 RHcare Uses DB Lytix Fr Real-Time In-Database

More information

Research Report. Abstract: Data Center Networking Trends. January 2012. By Jon Oltsik With Bob Laliberte and Bill Lundell

Research Report. Abstract: Data Center Networking Trends. January 2012. By Jon Oltsik With Bob Laliberte and Bill Lundell Research Reprt Abstract: Data Center Netwrking Trends By Jn Oltsik With Bb Laliberte and Bill Lundell January 2012 2012 Enterprise Strategy Grup, Inc. All Rights Reserved. Intrductin Research Objective

More information

Project Startup Report Presented to the IT Committee June 26, 2012

Project Startup Report Presented to the IT Committee June 26, 2012 Prject Name: SOS File 2.0 Agency: Secretary f State Business Unit/Prgram Area: Secretary f State Prject Spnsr: Al Jaeger Prject Manager: Beverly Maitland Prject Startup Reprt Presented t the IT Cmmittee

More information

Symantec User Authentication Service Level Agreement

Symantec User Authentication Service Level Agreement Symantec User Authenticatin Service Level Agreement Overview and Scpe This Symantec User Authenticatin service level agreement ( SLA ) applies t Symantec User Authenticatin prducts/services, such as Managed

More information

Build the cloud OpenStack Installation & Configuration Integration with existing tools and processes Cloud Migration

Build the cloud OpenStack Installation & Configuration Integration with existing tools and processes Cloud Migration Slutin Brief OpenStack Services OVERVIEW OnX understands clud adptin challenges f glbal enterprise cmpanies and helps Enterprises adpt OpenStack slutins thrugh targeted services. We ffer vertical industry

More information

Solution. Industry. Challenges. Client Case Study. Legacy Systems too Costly to Maintain. Supply Chain Advantage. Delivered.

Solution. Industry. Challenges. Client Case Study. Legacy Systems too Costly to Maintain. Supply Chain Advantage. Delivered. Supply Chain Advantage. Delivered. Client Case Study MEBC Supprts the Federal Aviatin Administratin Manage Prject Risk during Majr ERP Implementatin thrugh Independent Verificatin and Validatin (IV&V)

More information

The Total Economic Impact Of Mitel Virtual Solutions

The Total Economic Impact Of Mitel Virtual Solutions A Frrester Ttal Ecnmic Impact Study Prepared Fr Mitel Prject Directrs: Michelle S. Bishp, Senir Cnsultant Shaheen Parks, Senir Cnsultant January 2012 TABLE OF CONTENTS Executive Summary... 2 Mitel Virtual

More information

Business Plan Overview

Business Plan Overview Business Plan Overview Organizatin and Cntent Summary A business plan is a descriptin f yur business, including yur prduct yur market, yur peple and yur financing needs. Yu shuld cnsider that a well prepared

More information

QAD Operations BI Metrics Demonstration Guide. May 2015 BI 3.11

QAD Operations BI Metrics Demonstration Guide. May 2015 BI 3.11 QAD Operatins BI Metrics Demnstratin Guide May 2015 BI 3.11 Overview This demnstratin fcuses n ne aspect f QAD Operatins Business Intelligence Metrics and shws hw this functinality supprts the visin f

More information

Process Improvement Center of Excellence Service Proposal Recommendation. Operational Oversight Committee Report Submission

Process Improvement Center of Excellence Service Proposal Recommendation. Operational Oversight Committee Report Submission Prcess Imprvement Center f Excellence Service Prpsal Recmmendatin Operatinal Oversight Cmmittee Reprt Submissin INTRODUCTION This Prpsal prvides initial infrmatin regarding a pssible additin t a service.

More information

FINANCIAL SERVICES FLASH REPORT

FINANCIAL SERVICES FLASH REPORT FINANCIAL SERVICES FLASH REPORT Draft Regulatry Cmpliance Management Guideline Released by the Office f the Superintendent f Financial Institutins May 5, 2014 On April 30, 2014, the Office f the Superintendent

More information

Process Automation With VMware

Process Automation With VMware Prcess Autmatin With VMware Intelligent Service Autmatin fr Real and Virtual Envirnments Intrductin This Whitepaper describes hw the UC4 platfrm integrates with the VMware vsphere Server and the VMware

More information

MANITOBA SECURITIES COMMISSION STRATEGIC PLAN 2013-2016

MANITOBA SECURITIES COMMISSION STRATEGIC PLAN 2013-2016 MANITOBA SECURITIES COMMISSION STRATEGIC PLAN 2013-2016 The Manitba Securities Cmmissin (the Cmmissin) is a divisin f the Manitba Financial Services Agency (MFSA). The ther divisin is the Financial Institutins

More information

Research Report. Abstract: Security Management and Operations: Changes on the Horizon. July 2012

Research Report. Abstract: Security Management and Operations: Changes on the Horizon. July 2012 Research Reprt Abstract: Security Management and Operatins: Changes n the Hrizn By Jn Oltsik, Senir Principal Analyst With Kristine Ka and Jennifer Gahm July 2012 2012, The Enterprise Strategy Grup, Inc.

More information

Service Level Agreement (SLA) Hosted Products. Netop Business Solutions A/S

Service Level Agreement (SLA) Hosted Products. Netop Business Solutions A/S Service Level Agreement (SLA) Hsted Prducts Netp Business Slutins A/S Cntents 1 Service Level Agreement... 3 2 Supprt Services... 3 3 Incident Management... 3 3.1 Requesting service r submitting incidents...

More information

The Total Economic Impact Of: LifeSize HD Video Conferencing Solutions

The Total Economic Impact Of: LifeSize HD Video Conferencing Solutions A Frrester Ttal Ecnmic Impact Study Prepared Fr LifeSize, a Divisin f Lgitech The Ttal Ecnmic Impact Of: LifeSize HD Vide Cnferencing Slutins Prject Directr: Jnathan Lipsitz Cntributr: Paul Devine March

More information

Basics of Supply Chain Management

Basics of Supply Chain Management The Champlain Valley APICS Chapter is a premier prfessinal assciatin fr supply chain and peratins management and wrking tgether with the APICS rganizatin the leading prvider f research, educatin and certificatin

More information

Electronic Data Interchange (EDI) Requirements

Electronic Data Interchange (EDI) Requirements Electrnic Data Interchange (EDI) Requirements 1.0 Overview 1.1 EDI Definitin 1.2 General Infrmatin 1.3 Third Party Prviders 1.4 EDI Purchase Order (850) 1.5 EDI PO Change Request (860) 1.6 Advance Shipment

More information

Improved Data Center Power Consumption and Streamlining Management in Windows Server 2008 R2 with SP1

Improved Data Center Power Consumption and Streamlining Management in Windows Server 2008 R2 with SP1 Imprved Data Center Pwer Cnsumptin and Streamlining Management in Windws Server 2008 R2 with SP1 Disclaimer The infrmatin cntained in this dcument represents the current view f Micrsft Crpratin n the issues

More information

UNIVERSITY OF CALIFORNIA MERCED PERFORMANCE MANAGEMENT GUIDELINES

UNIVERSITY OF CALIFORNIA MERCED PERFORMANCE MANAGEMENT GUIDELINES UNIVERSITY OF CALIFORNIA MERCED PERFORMANCE MANAGEMENT GUIDELINES REFERENCES AND RELATED POLICIES A. UC PPSM 2 -Definitin f Terms B. UC PPSM 12 -Nndiscriminatin in Emplyment C. UC PPSM 14 -Affirmative

More information

Phi Kappa Sigma International Fraternity Insurance Billing Methodology

Phi Kappa Sigma International Fraternity Insurance Billing Methodology Phi Kappa Sigma Internatinal Fraternity Insurance Billing Methdlgy The Phi Kappa Sigma Internatinal Fraternity Executive Bard implres each chapter t thrughly review the attached methdlgy and plan nw t

More information

Change Management Process

Change Management Process Change Management Prcess B1.10 Change Management Prcess 1. Intrductin This plicy utlines [Yur Cmpany] s apprach t managing change within the rganisatin. All changes in strategy, activities and prcesses

More information

FundingEdge. Guide to Business Cash Advance & Bank Statement Loan Programs

FundingEdge. Guide to Business Cash Advance & Bank Statement Loan Programs Guide t Business Cash Advance & Bank Statement Lan Prgrams Cash Advances: $2,500 - $1,000,000 Business Bank Statement Lans: $5,000 - $500,000 Canada Cash Advances: $5,000 - $500,000 (must have 9 mnths

More information

CDC UNIFIED PROCESS PRACTICES GUIDE

CDC UNIFIED PROCESS PRACTICES GUIDE Dcument Purpse The purpse f this dcument is t prvide guidance n the practice f Business Case and t describe the practice verview, requirements, best practices, activities, and key terms related t these

More information

Maintain a balanced budget primarily the General & Park Funds

Maintain a balanced budget primarily the General & Park Funds EXHIBIT B City f Chic Budget Cntingency Plan P The purpse f the Budget Cntingency Plan is t establish a guideline and general apprach t respnd t adverse financial and ecnmic cnditins that culd negatively

More information

Research Report. Abstract: Advanced Malware Detection and Protection Trends. September 2013

Research Report. Abstract: Advanced Malware Detection and Protection Trends. September 2013 Research Reprt Abstract: Advanced Malware Detectin and Prtectin Trends By Jn Oltsik, Senir Principal Analyst With Jennifer Gahm, Senir Prject Manager September 2013 2013 by The Enterprise Strategy Grup,

More information

Training Efficiency: Optimizing Learning Technology

Training Efficiency: Optimizing Learning Technology Ideas & Insights frm 2008 Training Efficiency Masters Series Survey Results Training Efficiency: Optimizing Learning Technlgy trainingefficiency.cm Survey Results: Training Efficiency: Optimizing Learning

More information

Data Warehouse Scope Recommendations

Data Warehouse Scope Recommendations Rensselaer Data Warehuse Prject http://www.rpi.edu/datawarehuse Financial Analysis Scpe and Data Audits This dcument describes the scpe f the Financial Analysis data mart scheduled fr delivery in July

More information

Professional Leaders/Specialists

Professional Leaders/Specialists Psitin Prfile Psitin Lcatin Reprting t Jb family Band BI/Infrmatin Manager Wellingtn Prfessinal Leaders/Specialists Band I Date February 2013 1. POSITION PURPOSE The purpse f this psitin is t: Lead and

More information

HP ExpertOne. HP2-T21: Administering HP Server Solutions. Table of Contents

HP ExpertOne. HP2-T21: Administering HP Server Solutions. Table of Contents HP ExpertOne HP2-T21: Administering HP Server Slutins Industry Standard Servers Exam preparatin guide Table f Cntents Overview 2 Why take the exam? 2 HP ATP Server Administratr V8 certificatin 2 Wh shuld

More information

A Forrester Total Economic Impact Study Prepared For Microsoft The Total Economic Impact Of Microsoft Application Lifecycle Management

A Forrester Total Economic Impact Study Prepared For Microsoft The Total Economic Impact Of Microsoft Application Lifecycle Management A Frrester Ttal Ecnmic Impact Study Prepared Fr Micrsft The Ttal Ecnmic Impact Of Micrsft Applicatin Lifecycle Management Prject Directr: Jnathan W. Lipsitz Cntributrs: Jn Ericksn March 2013 TABLE OF CONTENTS

More information

Mobile Workforce. Improving Productivity, Improving Profitability

Mobile Workforce. Improving Productivity, Improving Profitability Mbile Wrkfrce Imprving Prductivity, Imprving Prfitability White Paper The Business Challenge Between increasing peratinal cst, staff turnver, budget cnstraints and pressure t deliver prducts and services

More information

Economic Justification: Measuring Return on Investment (ROI) and Cost Benefit Analysis (CBA)

Economic Justification: Measuring Return on Investment (ROI) and Cost Benefit Analysis (CBA) Advancing Statewide Spatial Data Infrastructures in Supprt f the Natinal Spatial Data Infrastructure (NSDI) Ecnmic Justificatin: Measuring Return n Investment (ROI) and Cst Benefit Analysis (CBA) Intrductin

More information

In connection with the SEC's Money Market Reform proposal, DST Systems, Inc. respectfully submits our comments for your consideration.

In connection with the SEC's Money Market Reform proposal, DST Systems, Inc. respectfully submits our comments for your consideration. DST September 18, 2013 Ms. Elizabeth M. Murphy Secretary Securities and Exchange Cmmissin 100 F. Street, NE Washingtn, DC 20549-1090 Subject: Mney Market Fund Refrm, File# 57-03-13 Dear Ms. Murphy: In

More information

expertise hp services valupack consulting description security review service for Linux

expertise hp services valupack consulting description security review service for Linux expertise hp services valupack cnsulting descriptin security review service fr Linux Cpyright services prvided, infrmatin is prtected under cpyright by Hewlett-Packard Cmpany Unpublished Wrk -- ALL RIGHTS

More information

Integrate Marketing Automation, Lead Management and CRM

Integrate Marketing Automation, Lead Management and CRM Clsing the Lp: Integrate Marketing Autmatin, Lead Management and CRM Circular thinking fr marketers 1 (866) 372-9431 www.clickpintsftware.cm Clsing the Lp: Integrate Marketing Autmatin, Lead Management

More information

Army DCIPS Employee Self-Report of Accomplishments Overview Revised July 2012

Army DCIPS Employee Self-Report of Accomplishments Overview Revised July 2012 Army DCIPS Emplyee Self-Reprt f Accmplishments Overview Revised July 2012 Table f Cntents Self-Reprt f Accmplishments Overview... 3 Understanding the Emplyee Self-Reprt f Accmplishments... 3 Thinking Abut

More information

OR 2) Implement and customize an off the shelf product that would suit the requirements

OR 2) Implement and customize an off the shelf product that would suit the requirements CRM Custmer Relatinship Management Request fr Prpsal (RFP) Created by : Gayathri Jaganathan Rle : Prject Manager Prpsal Date: 10/02/06 Organizatin: AIM Alliance Inspectin Management Cmpany Lcatin : 28235

More information

Business Intelligence represents a fundamental shift in the purpose, objective and use of information

Business Intelligence represents a fundamental shift in the purpose, objective and use of information Overview f BI and rle f DW in BI Business Intelligence & Why is it ppular? Business Intelligence Steps Business Intelligence Cycle Example Scenaris State f Business Intelligence Business Intelligence Tls

More information

A Forrester Total Economic Impact Study Prepared For F5 Networks The Total Economic Impact Of F5 Networks BIG-IP Security Solutions

A Forrester Total Economic Impact Study Prepared For F5 Networks The Total Economic Impact Of F5 Networks BIG-IP Security Solutions A Frrester Ttal Ecnmic Impact Study Prepared Fr F5 Netwrks The Ttal Ecnmic Impact Of F5 Netwrks BIG-IP Security Slutins Prject Directr: Dean Davisn August 2013 TABLE OF CONTENTS Executive Summary... 2

More information

The Total Economic Impact Of Deploying OnCommand Management Software As Part Of A NetApp Private Cloud Solution

The Total Economic Impact Of Deploying OnCommand Management Software As Part Of A NetApp Private Cloud Solution A Frrester Ttal Ecnmic Impact Study Prepared Fr NetApp The Ttal Ecnmic Impact Of Deplying OnCmmand Management Sftware As Part Of A NetApp Private Clud Slutin A Ttal Ecnmic Impact Analysis Prject Directr:

More information

Trends and Considerations in Currency Recycle Devices. What is a Currency Recycle Device? November 2003

Trends and Considerations in Currency Recycle Devices. What is a Currency Recycle Device? November 2003 Trends and Cnsideratins in Currency Recycle Devices Nvember 2003 This white paper prvides basic backgrund n currency recycle devices as cmpared t the cmbined features f a currency acceptr device and a

More information

VCU Payment Card Policy

VCU Payment Card Policy VCU Payment Card Plicy Plicy Type: Administrative Respnsible Office: Treasury Services Initial Plicy Apprved: 12/05/2013 Current Revisin Apprved: 12/05/2013 Plicy Statement and Purpse The purpse f this

More information

The Total Economic Impact Of KPN s Managed Video Services

The Total Economic Impact Of KPN s Managed Video Services A Frrester Ttal Ecnmic Impact Study Prepared Fr KPN The Ttal Ecnmic Impact Of KPN s Managed Vide Services As Used By A Large Financial Service Organizatin Prject Directr: Sebastian Selhrst March 2012 TABLE

More information

Licensing Windows Server 2012 R2 for use with virtualization technologies

Licensing Windows Server 2012 R2 for use with virtualization technologies Vlume Licensing brief Licensing Windws Server 2012 R2 fr use with virtualizatin technlgies (VMware ESX/ESXi, Micrsft System Center 2012 R2 Virtual Machine Manager, and Parallels Virtuzz) Table f Cntents

More information

POLICY 1390 Information Technology Continuity of Business Planning Issued: June 4, 2009 Revised: June 12, 2014

POLICY 1390 Information Technology Continuity of Business Planning Issued: June 4, 2009 Revised: June 12, 2014 State f Michigan POLICY 1390 Infrmatin Technlgy Cntinuity f Business Planning Issued: June 4, 2009 Revised: June 12, 2014 SUBJECT: APPLICATION: PURPOSE: CONTACT AGENCY: Plicy fr Infrmatin Technlgy (IT)

More information

Customer Support & Software Enhancements Policy

Customer Support & Software Enhancements Policy Custmer Supprt & Sftware Enhancements Plicy Welcme t Manhattan Assciates Custmer Supprt Organizatin (CSO). Staying current n Custmer Supprt & Sftware Enhancements and n a supprted versin f the licensed

More information

The Importance of Market Research

The Importance of Market Research The Imprtance f Market Research 1. What is market research? Successful businesses have extensive knwledge f their custmers and their cmpetitrs. Market research is the prcess f gathering infrmatin which

More information

CMS Eligibility Requirements Checklist for MSSP ACO Participation

CMS Eligibility Requirements Checklist for MSSP ACO Participation ATTACHMENT 1 CMS Eligibility Requirements Checklist fr MSSP ACO Participatin 1. General Eligibility Requirements ACO participants wrk tgether t manage and crdinate care fr Medicare fee-fr-service beneficiaries.

More information

Job Classification Details Department Job Function Job Family Job Title Job Code Salary Level

Job Classification Details Department Job Function Job Family Job Title Job Code Salary Level Jb Classificatin Details Department Jb Functin Jb Family Jb Title Jb Cde Salary Level Chief Diversity Office Marketing, Cmmunicatins, & Outreach Cmmunicatin/Cnstituent Relatins Cmmunicatins Crdinatr PMP1

More information

COE: Hybrid Course Request for Proposals. The goals of the College of Education Hybrid Course Funding Program are:

COE: Hybrid Course Request for Proposals. The goals of the College of Education Hybrid Course Funding Program are: COE: Hybrid Curse Request fr Prpsals The gals f the Cllege f Educatin Hybrid Curse Funding Prgram are: T supprt the develpment f effective, high-quality instructin that meets the needs and expectatins

More information

REQUEST FOR PROPOSAL FOR SHAREPOINT LEGISLATIVE MANAGEMENT SERVICES

REQUEST FOR PROPOSAL FOR SHAREPOINT LEGISLATIVE MANAGEMENT SERVICES REQUEST FOR PROPOSAL FOR SHAREPOINT LEGISLATIVE MANAGEMENT SERVICES The Wyming Legislature is at a pivtal pint in the management f its infrmatin and we are lking fr an accmplished firm with SharePint technlgy

More information

Leoni s implementation of a travel and expense solution

Leoni s implementation of a travel and expense solution Leni s implementatin f a travel and expense slutin Abut Leni The German cabling cmpany Leni is ne f the biggest and mst internatinal strategic suppliers t the autmbile industry. The enterprise emplys 450

More information

Disk Redundancy (RAID)

Disk Redundancy (RAID) A Primer fr Business Dvana s Primers fr Business series are a set f shrt papers r guides intended fr business decisin makers, wh feel they are being bmbarded with terms and want t understand a cmplex tpic.

More information

Security Services. Service Description Version 1.00. Effective Date: 07/01/2012. Purpose. Overview

Security Services. Service Description Version 1.00. Effective Date: 07/01/2012. Purpose. Overview Security Services Service Descriptin Versin 1.00 Effective Date: 07/01/2012 Purpse This Enterprise Service Descriptin is applicable t Security Services ffered by the MN.IT Services and described in the

More information

Licensing Windows Server 2012 for use with virtualization technologies

Licensing Windows Server 2012 for use with virtualization technologies Vlume Licensing brief Licensing Windws Server 2012 fr use with virtualizatin technlgies (VMware ESX/ESXi, Micrsft System Center 2012 Virtual Machine Manager, and Parallels Virtuzz) Table f Cntents This

More information

HEALTH INFORMATION EXCHANGE GRANTS CRITERIA

HEALTH INFORMATION EXCHANGE GRANTS CRITERIA 1 HEALTH INFORMATION EXCHANGE GRANTS CRITERIA INTRODUCTION On August, 20 th, the federal Office f the Natinal Crdinatr fr Health Infrmatin Technlgy (ONC) released an pprtunity fr states t apply fr between

More information

Implementing an electronic document and records management system using SharePoint 7

Implementing an electronic document and records management system using SharePoint 7 Reprt title Agenda item Implementing an electrnic dcument and recrds management system using SharePint 7 Meeting Finance, Prcurement & Prperty Cmmittee 16 June 2008 Date Reprt by Dcument Number Head f

More information

How to Reduce Project Lead Times Through Improved Scheduling

How to Reduce Project Lead Times Through Improved Scheduling Hw t Reduce Prject Lead Times Thrugh Imprved Scheduling PROBABILISTIC SCHEDULING & BUFFER MANAGEMENT Cnventinal Prject Scheduling ften results in plans that cannt be executed and t many surprises. In many

More information

2012 Global Business Intelligence Software Survey: Companies Desire Smaller, Better Targeted End-User Solutions

2012 Global Business Intelligence Software Survey: Companies Desire Smaller, Better Targeted End-User Solutions 2012 BizTechReprts Editrial Directr: Lane F. Cper Industry Relatins Directr: Carl J. Cper 2012 Glbal Business Intelligence Sftware Survey: Cmpanies Desire Smaller, Better Targeted End-User Slutins Bth

More information

How Does Cloud Computing Work?

How Does Cloud Computing Work? Hw Des Clud Cmputing Wrk? Carl Mazzanti, CEO, emazzanti Technlgies IT Supprt and Clud Cmputing Services fr Small Business Hbken, NJ and NYC, 201-360- 4400 Owner [Pick the date] Hw des Clud Cmputing Wrk?

More information

AHI. Foreign Pre-Approval Inspections (PAIs) Points to Consider

AHI. Foreign Pre-Approval Inspections (PAIs) Points to Consider AHI Freign Pre-Apprval Inspectins (PAIs) Pints t Cnsider The fllwing suggestins are intended t prvide spnsr guidance fr timeliness and predictability f freign PAIs. The FDA Center fr Veterinary Medicine

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland Cunty Department f Infrmatin Technlgy Prject Scpe and Apprach Prject Name: Web-Based Permanency Database Prject ID: DB1314PD Leadership Grup: Curts Department: Circuit Curt Divisin: Family Prject

More information

Aim The aim of a communication plan states the overall goal of the communication effort.

Aim The aim of a communication plan states the overall goal of the communication effort. Develping a Cmmunicatin Plan- Aim Aim The aim f a cmmunicatin plan states the verall gal f the cmmunicatin effrt. Determining the Aim Ask yurself r yur team what the verall gal f the cmmunicatin plan is.

More information

ITIL Release Control & Validation (RCV) Certification Program - 5 Days

ITIL Release Control & Validation (RCV) Certification Program - 5 Days ITIL Release Cntrl & Validatin (RCV) Certificatin Prgram - 5 Days Prgram Overview ITIL is a set f best practices guidance that has becme a wrldwide-adpted framewrk fr Infrmatin Technlgy Services Management

More information

IT CHANGE MANAGEMENT POLICY

IT CHANGE MANAGEMENT POLICY IT CHANGE MANAGEMENT POLICY Effective Date May 19, 2016 Crss-Reference 1. IT Operatins and Maintenance Plicy 2. IT Security Incident Management Plicy Respnsibility Apprver Review Schedule 1. Plicy Statement

More information

Chapter 7 Business Continuity and Risk Management

Chapter 7 Business Continuity and Risk Management Chapter 7 Business Cntinuity and Risk Management Sectin 01 Business Cntinuity Management 070101 Initiating the Business Cntinuity Plan (BCP) Purpse: T establish the apprpriate level f business cntinuity

More information

SaaS Listing CA Cloud Service Management

SaaS Listing CA Cloud Service Management SaaS Listing CA Clud Service Management 1. Intrductin This dcument prvides standards and features that apply t the CA Clud Service Management (CSM) SaaS ffering prvided t the Custmer and defines the parameters

More information

State of Wisconsin. File Server Service Service Offering Definition

State of Wisconsin. File Server Service Service Offering Definition State f Wiscnsin File Server Service Service Offering Definitin Dcument Revisin Histry Date Versin Creatr Ntes 2/16/2008 1.0 JD Urfer First pass 2/16/2008 2.0 Tm Runge Editing changes 2/19/2009 2.1 Tm

More information

Mobile Telecom Expense Management

Mobile Telecom Expense Management Mbile Telecm Expense Management Quick Start Mbile Telecm Expense Management Intrductin The BT Mbile Telecm Expense Management Quick Start Service is part BT Managed Mbility Expenses* BT s suite f telecm

More information

Communal Property Institution Capacity Assessment Tool

Communal Property Institution Capacity Assessment Tool Cmmunal Prperty Institutin Capacity Assessment Tl Intrductin t cmmunal prperty institutins Cmmunal prperty institutins (CPIs) Participants in the land refrm prgramme can hld prperty thrugh different frms

More information

FINANCE SCRUTINY SUB-COMMITTEE

FINANCE SCRUTINY SUB-COMMITTEE REPORT FOR: PERFORMANCE AND FINANCE SCRUTINY SUB-COMMITTEE Date f Meeting: 6 January 2015 Subject: Staff Survey and Sickness Absence Mnitring Results and Actin plans Respnsible Officer: Scrutiny Lead Member

More information

Online Learning Portal best practices guide

Online Learning Portal best practices guide Online Learning Prtal Best Practices Guide best practices guide This dcument prvides Micrsft Sftware Assurance Benefit Administratrs with best practices fr implementing e-learning thrugh the Micrsft Online

More information

What is Software Risk Management? (And why should I care?)

What is Software Risk Management? (And why should I care?) What is Sftware Risk Management? (And why shuld I care?) Peter Kulik, KLCI, Inc. 1 st Editin, Octber 1996 Risks are schedule delays and cst verruns waiting t happen. As industry practices have imprved,

More information